Skip to main content

Fast lifting with ClickLift

When the finish surface layer is being applied, the manhole cover can be raised with the ClickLift frame extender.
By David Arminas May 14, 2020 Read time: 2 mins
ClickLift raises Wrekin Highway and TriStar frames to suit the final surface layer without the need for digging out and re-installing

It’s common practice for manhole covers to be installed in the early stages of a housing development, well before the final tarmac is laid. This means that the manhole cover is installed proud of the binding layer, but making it susceptible to construction traffic damage. Or, if installed level with the binding layer, it must be entirely dug out and effectively re-installed.

Both scenarios mean additional costs and potential complications.

To counter this, Wrekin Products has created ClickLift to raise Wrekin Highway and TriStar frames to suit the final surface layer without the need for digging out and re-installing. The cover and the frame are installed at the binding layer level to reduce the possibility of site damage.

When the finish surface layer is being applied, the manhole cover can be raised with the ClickLift frame extender, simply and quickly, explains Simon Gibson, technical director at Wrekin Products.

“When specifying covers for developments, we’ve also noticed that specifiers sometimes don’t consider the construction phase traffic and the impact of site vehicles on ironwork,” he says.

“The new product is kitemarked by BSi and is available with four fixed incremental depths – 30/40/50/60mm – for two clear openings – 600/675mm. It is designed for use with both Wrekin’s Highway manhole cover range and TriStar manhole cover range.”

Wrekin has a full range of geosynthetic solutions for ground stabilisation, reinforcement, erosion control, drainage and other environmental issues. The company, based in the UK, recently announced that its Unite series of manhole covers and gully tops now comes with a 10-year guarantee and that its products have been in service on highways around the UK for more than 11 years with zero failures on 250,000 installations.

Related Content

  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b
  • Road recycling developments coming to market
    March 22, 2017
    Major manufacturers are introducing new machines for road milling and recycling that will boost output and lower the cost/m - Mike Woof writes New machines for milling and road recycling will offer increased performance and productivity than earlier generation equipment. Higher quality cutting will help contractors achieve smoother surfaces and considerably lower paving costs also. Meanwhile new recycler/stabiliser machines will offer a better cost/m and improve the economics of road recycling for contra
  • Protecting new asphalt overlay
    October 20, 2017
    Techniques can help in preventing cracks in underlying layers from penetrating to new surface layers - *Farzad Tooryani. For road repairs involving milling off worn asphalt surface layers before repaving, the use of crack sealing is a crucial task. This can help to prevent full reflection of existing cracks from underneath layers into the new wearing course. Once the milling work is complete, locating existing cracks is a crucial task for the site supervisor. Efficient routing equipment that is easy to hand
  • Time, money and the environment – reducing the costs of a road project
    April 23, 2013
    Road construction has evolved considerably in recent years and today more options are available, offering greater longevity and durability, lowered costs, faster application and reduced impact on the environment. The fact that more options are available, however, means that more critical decisions must be made in order to ensure that the optimal solution is selected for the specific needs of each project. In this article we will look at some of the variables that should be considered, while examining the va