Skip to main content

Fast lifting with ClickLift

When the finish surface layer is being applied, the manhole cover can be raised with the ClickLift frame extender.
By David Arminas May 14, 2020 Read time: 2 mins
ClickLift raises Wrekin Highway and TriStar frames to suit the final surface layer without the need for digging out and re-installing

It’s common practice for manhole covers to be installed in the early stages of a housing development, well before the final tarmac is laid. This means that the manhole cover is installed proud of the binding layer, but making it susceptible to construction traffic damage. Or, if installed level with the binding layer, it must be entirely dug out and effectively re-installed.

Both scenarios mean additional costs and potential complications.

To counter this, Wrekin Products has created ClickLift to raise Wrekin Highway and TriStar frames to suit the final surface layer without the need for digging out and re-installing. The cover and the frame are installed at the binding layer level to reduce the possibility of site damage.

When the finish surface layer is being applied, the manhole cover can be raised with the ClickLift frame extender, simply and quickly, explains Simon Gibson, technical director at Wrekin Products.

“When specifying covers for developments, we’ve also noticed that specifiers sometimes don’t consider the construction phase traffic and the impact of site vehicles on ironwork,” he says.

“The new product is kitemarked by BSi and is available with four fixed incremental depths – 30/40/50/60mm – for two clear openings – 600/675mm. It is designed for use with both Wrekin’s Highway manhole cover range and TriStar manhole cover range.”

Wrekin has a full range of geosynthetic solutions for ground stabilisation, reinforcement, erosion control, drainage and other environmental issues. The company, based in the UK, recently announced that its Unite series of manhole covers and gully tops now comes with a 10-year guarantee and that its products have been in service on highways around the UK for more than 11 years with zero failures on 250,000 installations.

Related Content

  • Marini mobile asphalt plant XPRESS 2500 P at Reykjavik Airport
    May 17, 2017
    Iceland, being a volcanic island and still active, must import aggregates and bitumen for road construction. The island’s 104,000km² and its 333,000 inhabitants are susceptible to daily seismic activity of some kind. However, airline passengers, either visiting the country as tourist or in transit, are increasing by around 20% per year so good airport services are essential. As such, Colas is resurfacing the main runway and constructing a third strip and contracting other road works. The highway network i
  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en
  • Bridge inspection: destructive versus non-destructive methods
    January 6, 2015
    Tens of thousands of bridges in the United States are in desperate need of repair. But where to begin analysing their deteriorating state? Roger Roberts* investigates tips and techniques for ensuring bridge safety The average age of America’s more than 600,000 crumbling bridges is 42 years – many are 60 to 80 years old. The situation is dire, with many described as functionally obsolete, according to the American Society of Civil Engineers’ latest edition of its Report Card for America’s Infrastructure.
  • Recycling machines have helped add new lanes to an Italian highway
    May 30, 2013
    The use of recycling and stabilisation equipment has played a key role in adding new lanes to a congested Italian highway. Running from Bologna to Taranto, the A14 Autostrade has seen a major increase in traffic volumes for several years. Data shows that traffic has increased around 4% year on year with some 110,000 vehicles using the highway/day. The traffic growth trend looks set to continue and this resulted in the Italian Government opting to upgrade and widen the route.