Skip to main content

Fast lifting with ClickLift

When the finish surface layer is being applied, the manhole cover can be raised with the ClickLift frame extender.
By David Arminas May 14, 2020 Read time: 2 mins
ClickLift raises Wrekin Highway and TriStar frames to suit the final surface layer without the need for digging out and re-installing

It’s common practice for manhole covers to be installed in the early stages of a housing development, well before the final tarmac is laid. This means that the manhole cover is installed proud of the binding layer, but making it susceptible to construction traffic damage. Or, if installed level with the binding layer, it must be entirely dug out and effectively re-installed.

Both scenarios mean additional costs and potential complications.

To counter this, Wrekin Products has created ClickLift to raise Wrekin Highway and TriStar frames to suit the final surface layer without the need for digging out and re-installing. The cover and the frame are installed at the binding layer level to reduce the possibility of site damage.

When the finish surface layer is being applied, the manhole cover can be raised with the ClickLift frame extender, simply and quickly, explains Simon Gibson, technical director at Wrekin Products.

“When specifying covers for developments, we’ve also noticed that specifiers sometimes don’t consider the construction phase traffic and the impact of site vehicles on ironwork,” he says.

“The new product is kitemarked by BSi and is available with four fixed incremental depths – 30/40/50/60mm – for two clear openings – 600/675mm. It is designed for use with both Wrekin’s Highway manhole cover range and TriStar manhole cover range.”

Wrekin has a full range of geosynthetic solutions for ground stabilisation, reinforcement, erosion control, drainage and other environmental issues. The company, based in the UK, recently announced that its Unite series of manhole covers and gully tops now comes with a 10-year guarantee and that its products have been in service on highways around the UK for more than 11 years with zero failures on 250,000 installations.

Related Content

  • New developments in road recycling and milling
    June 11, 2019
    New developments in road recycling and milling will allow contractors to remove old surfaces more quickly and efficiently – Mike Woof reports
  • Wirtgen fleet helps build Romanian road
    December 17, 2013
    A fleet of Wirtgen machines is helping build a section of a major highway in Romania, the Transylvanian Autostrada A3. This 588km road connects Romanian capital Bucharest with the Hungarian border and links to the Hungarian M4 highway. Plans for the A3 got the go-ahead in 2004 and the route runs via Ploieti, Braov, Sighioara, Târgu Mure, Cluj-Napoca, Zalau and Oradea to the Hungarian border, with completion scheduled for 2017.
  • Innovative road construction
    February 19, 2024
    Wirtgen is introducing an innovative concept for road construction in the shape of its new WRC 240(i) rock crusher. The machine has been developed from the firm’s proven soil stabiliser technology and is designed to break coarse rocks in-situ, as found in hand-packed pavement layers.
  • EAPA’s 10th Symposium: sustainability and communication issues
    July 19, 2017
    Sustainability and the highways sector’s image issue were two major themes at the 10th symposium of the European Asphalt Paving Association in Paris. Margo Cole reports. Sustainability was explicit or implicit in many presentations during EAPA’s biennial symposium for the paving supply chain. The industry feels that sustainability is its home territory, thanks to an already good – and getting even better - record of recycling of materials. But do buyers and users of roads realise that the design and contrac