Skip to main content

Extending surface life in airport applications

The US-based specialist Asphalt Systems Inc (ASI) says that if used properly, its GSB products can maintain asphalt pavement condition for decades. The company says that field trials and studies support the asphalt life extension claims for the product. During the 1990s, an ASI GSB sealer was evaluated through two independent field trials in Oregon – Portland International Airport (PDX) and Mulino State Airport (4S9). In both cases, the sealer was applied as a part of a preventive maintenance programme, and
October 1, 2018 Read time: 3 mins
Using the ASI product is said to have increased asphalt pavement life in field trials at various US airports
The US-based specialist Asphalt Systems Inc (ASI) says that if used properly, its GSB products can maintain asphalt pavement condition for decades. The company says that field trials and studies support the asphalt life extension claims for the product. During the 1990s, an ASI GSB sealer was evaluated through two independent field trials in Oregon – Portland International Airport (PDX) and Mulino State Airport (4S9). In both cases, the sealer was applied as a part of a preventive maintenance programme, and long-term performance was monitored. The data for PDX Taxiway C showed that the GSB product was able to maintain the taxiway pavement for the trial period of eight years. Performance data of the Mulino runway trial showed that the GSB sealer kept the runway in condition for 10 years by interrupting ageing, including stopping ravelling and weathering.


Other airport runway examples of ongoing and effective pavement preservation include Blanding Municipal Airport (BDG) in Utah, which has had four treatments of GSB-88 over the past 26 years. The runway pavement at Central Colorado Regional Airport (AEJ) in Buena Vista is 22 years old, and has had three treatments of GSB-88. PCI data on this airfield from the CoDOT Division of Aeronautics website shows that the pavement has remained in good condition.

Navy Facilities Command (NAVFAC) pavement specialists have performed a long-term evaluation of 1 million m2 of GSB applications on widely varying military airfield pavements and climates. In addition, the MicroPAVER data for 883 treated municipal airfield pavements across multiple climatic zones was critically evaluated. In both cases, the results of the evaluation were positive and demonstrated significant life extension. An effective pavement preservation material, GSB-88 can also help rebinding ravelling pavements, which can mitigate asphalt-based foreign object debris (FOD). GSB-88’s ability to extend the useful life of asphalt airfield pavements is generally between 25-50% with a single application.

Gilsonite, an integral component of ASI’s GSB products, is a naturally occurring asphaltite found in Utah. GSB products comprise a mixture of Gilsonite, specially selected plasticisers and oils that penetrate and reintroduce essential binders into the pavement matrix. They are designed to mitigate the impacts of surface oxidation and moisture damage on asphalt pavements, halting deterioration and sealing the surface to help repel water.

Related Content

  • New M90 surfacing in the UK gain praise
    January 8, 2013
    Early evaluation of surfacing work on the M90 at Rosyth – the first major application of Scotland’s new TS2010 specification – has earned positive praise. Transport Scotland’s determination to obtain pavement that is durable, long lasting and safe (especially in early life) is clearly apparent on the M90 just north of the Forth Road Bridge. Here surfacing has been carried out this spring to TS2010, a tough new specification designed to ensure thin surfacing pavements that work. And the initial prognosis is
  • Using radar to deliver a fine runway finish
    April 4, 2014
    Radar Portal Systems (RPS) has spent a lot of time developing its sophisticated pavement top-surface photometric imaging system so it can cater specifically for the aviation market. This has now been specially developed for use on aircraft runways and taxiways The system was recently used at Brisbane Airport to survey runway and runway shoulders, collecting photometric top-surface data at a 4m width at speeds of up to 100km/h. This dataset allows the firm to display meshing data of the runway surface showin
  • Meeting the challenge of desert runway resurfacing
    February 8, 2012
    Ferocious daytime temperatures can provide a tough challenge to construction firms working in desert conditions in Egypt's south. Despite the high daytime temperatures however, Egyptian contractor Orascom has managed to complete an airport project on budget and ahead of schedule, while meeting the client's tight specifications.
  • Meeting the challenge of desert runway resurfacing
    April 13, 2012
    Ferocious daytime temperatures can provide a tough challenge to construction firms working in desert conditions in Egypt's south. Despite the high daytime temperatures however, Egyptian contractor Orascom has managed to complete an airport project on budget and ahead of schedule, while meeting the client's tight specifications. The firm has just completed the project to revamp Suhag Airport in the south of the country. This airport now features a new runway, taxiways and aircraft hard standing, as well as n