Skip to main content

Eurovia Surfacing gives Windsor the royal treatment

Eurovia Surfacing recently completed resurfacing works on the prestigious Thames Street in the English city of Windsor – home to the UK royal family’s Windsor Castle. Thames Street runs up the side of the castle to the main gate. Resurfacing was carried out as part of the annual programme of work that Eurovia Surfacing undertakes on behalf of the Royal Borough of Windsor and Maidenhead.
May 15, 2017 Read time: 2 mins
Road surfacing fit for a queen
Eurovia Surfacing recently completed resurfacing works on the prestigious Thames Street in the English city of Windsor – home to the UK royal family’s Windsor Castle. Thames Street runs up the side of the castle to the main gate.


Resurfacing was carried out as part of the annual programme of work that 3281 Eurovia Surfacing undertakes on behalf of the Royal Borough of Windsor and Maidenhead.

Eurovia Surfacing secured the contract in 2013, re-won it in 2014 and successfully renegotiated the retention of the contract for 2015 and 2016.

Works include planing the road surface and replacing it with 45mm of a 14mm thin surface course system over 1800m². This had to be delivered in two halves, starting at the lower end on the first day and completing the top half up to the castle entrance on the second day.

Windsor is very popular with tourists and Christmas shoppers during December which made the works slightly more challenging for the teams involved but all went successfully.

For more information on companies in this article

Related Content

  • Maybe Hire takes on Whorlton Bridge
    March 14, 2025
    For refurbishment of the old English bridge, a temporary cable crane structure - designed by CaSE Civil & Structural Engineering - used a range of Mabey Hire’s propping equipment, including the Mass 50, System 160 and Mat 125 products.
  • Easing temporary highway danger
    February 22, 2013
    Some of the latest speedometer technology has been successfully trialled in French highway work zones, while tireless work continues across Europe and the United States to reduce the number of work zone deaths and serious injuries involving road workers and motorists. Guy Woodford reports The number of roadworkers being killed and seriously injured on England’s motorways and major trunk roads more than doubled between 2007 and 2010 – from no deaths and 14 serious injuries. This rise has led to to major camp
  • Economic gains from widening the A453 in Nottingham, England
    August 12, 2014
    Work is well underway on turning a busy just over 11km two-lane link road from the city of Nottingham to Junction 24 of the M1 in Leicestershire, England into a four-lane highway. The widened highway will relieve considerable peak-time congestion for travellers to Nottingham, the M1 and East Midlands Airport while also making journeys safer and more reliable. Guy Woodford reports Used by up to 30,000 vehicles a day, the A453 is renowned for congestion at peak travel times. But years of day-to-day commuter a
  • Eurovia success in Hertfordshire, England contracts bid
    October 11, 2012
    Eurovia Infrastructure is the only contractor to secure a position on all three Lots of the US $ 144.02 million (£90mn) Hertfordshire Highways Structural Maintenance and Surface Treatments Framework contracts. The contracts began on 1 October 2012 and will run for four years. Lot 1 of the Hertfordshire County Council contract covers carriageway and footway surface treatments; Lot 2 covers carriageway resurfacing; and Lot 3 covers general civil engineering.