Skip to main content

Eurovia Surfacing gives Windsor the royal treatment

Eurovia Surfacing recently completed resurfacing works on the prestigious Thames Street in the English city of Windsor – home to the UK royal family’s Windsor Castle. Thames Street runs up the side of the castle to the main gate. Resurfacing was carried out as part of the annual programme of work that Eurovia Surfacing undertakes on behalf of the Royal Borough of Windsor and Maidenhead.
May 15, 2017 Read time: 2 mins
Road surfacing fit for a queen
Eurovia Surfacing recently completed resurfacing works on the prestigious Thames Street in the English city of Windsor – home to the UK royal family’s Windsor Castle. Thames Street runs up the side of the castle to the main gate.


Resurfacing was carried out as part of the annual programme of work that 3281 Eurovia Surfacing undertakes on behalf of the Royal Borough of Windsor and Maidenhead.

Eurovia Surfacing secured the contract in 2013, re-won it in 2014 and successfully renegotiated the retention of the contract for 2015 and 2016.

Works include planing the road surface and replacing it with 45mm of a 14mm thin surface course system over 1800m². This had to be delivered in two halves, starting at the lower end on the first day and completing the top half up to the castle entrance on the second day.

Windsor is very popular with tourists and Christmas shoppers during December which made the works slightly more challenging for the teams involved but all went successfully.

For more information on companies in this article

Related Content

  • UK Roads Crash Demo Day is a Big Hit
    July 19, 2012
    Representatives from local authorities, the police, and the highway safety-related business world attended last month’s UK Roads Crash Demonstration Day at MIRA near Nuneaton, in central England. Guy Woodford reports It was never meant to be an occasion for crash test dummies. And each of the latest road safety solutions from leading highway technology companies tested at the UK Roads Crash Demonstration Day passed with top marks. A crowd of over 100 enjoyed the high impact, minimum damage action.
  • Upgrading a busy A road link in the UK
    July 4, 2018
    The upgrade to the UK’s busy A14 route will address a significant traffic bottleneck - Mike Woof writes The UK is suffering badly from traffic congestion, a problem that is particularly severe in and around its major cities. Lack of investment in road construction over many years has resulted in a major backlog of work, while the country has seen growing vehicle numbers. To make matters worse, there have been few additions to the major road network since the late 1980s and early 1990s. And the combinatio
  • Wirtgen Group machines delivering new runway for German airbase
    October 26, 2016
    Machines from the Wirtgen Group are carrying out an important reconstruction job for the surface course at Büchel Air Base. Road machinery from Hamm, Vögele and Wirtgen as well as asphalt plants from Benninghoven have been carrying out the work, delivering a new runway within a tight timeframe. To achieve this, the work had to be planned well in advance, with the contractors organising the logistics and their personnel accordingly.
  • Historic promenade given a facelift
    July 17, 2012
    In the UK, Foster Contracting was part of the team that carried out road improvements to the main route along the historic promenade of the seaside town Great Yarmouth, in eastern England. The harshness of the sea environment coupled with traffic loading caused the road surface to deteriorate, leading to brittle cracking of the thin surface course and also reflective cracking from overlain service trenches and patches. The town centre was already undergoing a major regeneration and as part of this scheme, i