Skip to main content

Eurovia Surfacing gives Windsor the royal treatment

Eurovia Surfacing recently completed resurfacing works on the prestigious Thames Street in the English city of Windsor – home to the UK royal family’s Windsor Castle. Thames Street runs up the side of the castle to the main gate. Resurfacing was carried out as part of the annual programme of work that Eurovia Surfacing undertakes on behalf of the Royal Borough of Windsor and Maidenhead.
May 15, 2017 Read time: 2 mins
Road surfacing fit for a queen
Eurovia Surfacing recently completed resurfacing works on the prestigious Thames Street in the English city of Windsor – home to the UK royal family’s Windsor Castle. Thames Street runs up the side of the castle to the main gate.


Resurfacing was carried out as part of the annual programme of work that 3281 Eurovia Surfacing undertakes on behalf of the Royal Borough of Windsor and Maidenhead.

Eurovia Surfacing secured the contract in 2013, re-won it in 2014 and successfully renegotiated the retention of the contract for 2015 and 2016.

Works include planing the road surface and replacing it with 45mm of a 14mm thin surface course system over 1800m². This had to be delivered in two halves, starting at the lower end on the first day and completing the top half up to the castle entrance on the second day.

Windsor is very popular with tourists and Christmas shoppers during December which made the works slightly more challenging for the teams involved but all went successfully.

For more information on companies in this article

Related Content

  • Washington DC’s historic bridge replacement project
    June 11, 2019
    The project to replace a historic bridge in US capital Washington DC is providing major challenges for its builders - Mike Woof writes
  • Launch soon for the Sunderland Bridge’s deck across the Wear
    March 24, 2017
    The team constructing the New Wear Crossing near the English city of Sunderland is preparing for the final launch of the 300m bridge deck. In recent weeks, the legs of the 100m-tall centrepiece have been secured to the foundations within the riverbed and most of the rigging used to raise it into place has been removed. While the bridge deck was being painted, the bottoms of both pylon legs were filled with 175tonnes of concrete, The next major process will be to slowly pull the bridge deck out acr
  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong