Skip to main content

Envirobed's Welsh roads test

A NOVEL resin alternative has been used to repair roads in North Wales in the UK. The product, supplied by Ultracrete, has been used to provide a durable, high-strength ironwork reinstatement. The cement-based resin alternative material, Envirobed HA104, was tested by the North Wales Trunk Road Agency. Resins have traditionally been the first choice for ironwork reinstatement, due to their high performance and rapid set times. Until now it had always been difficult to match the same performance charac
February 14, 2012 Read time: 2 mins
Long lasting repair performance is claimed for the new Ultracrete system
A NOVEL resin alternative has been used to repair roads in North Wales in the UK. The product, supplied by 2492 Ultracrete, has been used to provide a durable, high-strength ironwork reinstatement. The cement-based resin alternative material, Envirobed HA104, was tested by the 2312 North Wales Trunk Road Agency.

Resins have traditionally been the first choice for ironwork reinstatement, due to their high performance and rapid set times.

Until now it had always been difficult to match the same performance characteristics using an alternative material. However this new product is a revolutionary, next generation, environmentally friendly bedding mortar alternative to resin-based materials.

It is supplied as a two-component system which contains a blend of special cements, polymer-graded aggregates and recycled glass. The combined components provide a high performance mortar, which can be used for depths of 10-50mm in one pass. If necessary, greater depths can be achieved by using a layer-uponlayer method.

The trial in the Pen y Clip Tunnel on the A55 trunk road was carried out to assess its performance at a location featuring sustained high traffic volumes.

The product offers early tensile strengths that provide significant resistance to heavy traffic volumes.

For more information on companies in this article

Related Content

  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Bomag launches tractor-towed stabiliser range
    January 19, 2022
    Both models have a working width of 2.5m while the RS 250 version has a milling depth of up to 40cm and the RS 300 version has a depth of 50cm.
  • Steel barrier innovation boosts roadway safety
    December 3, 2014
    New developments in road equipment systems are the product of innovation in engineering and are helping boost safety. Despite an improvement in road safety over recent years, road accidents and their consequences remain a serious social problem. To limit the potential of accidents, the performance of road equipment such as safety barriers and lighting poles are defined by European standards (EN1317 and EN 12767). As CE-Marking to these standards is now based on performance requirements and not on national h