Skip to main content

Envirobed's Welsh roads test

A NOVEL resin alternative has been used to repair roads in North Wales in the UK. The product, supplied by Ultracrete, has been used to provide a durable, high-strength ironwork reinstatement. The cement-based resin alternative material, Envirobed HA104, was tested by the North Wales Trunk Road Agency. Resins have traditionally been the first choice for ironwork reinstatement, due to their high performance and rapid set times. Until now it had always been difficult to match the same performance charac
February 14, 2012 Read time: 2 mins
Long lasting repair performance is claimed for the new Ultracrete system
A NOVEL resin alternative has been used to repair roads in North Wales in the UK. The product, supplied by 2492 Ultracrete, has been used to provide a durable, high-strength ironwork reinstatement. The cement-based resin alternative material, Envirobed HA104, was tested by the 2312 North Wales Trunk Road Agency.

Resins have traditionally been the first choice for ironwork reinstatement, due to their high performance and rapid set times.

Until now it had always been difficult to match the same performance characteristics using an alternative material. However this new product is a revolutionary, next generation, environmentally friendly bedding mortar alternative to resin-based materials.

It is supplied as a two-component system which contains a blend of special cements, polymer-graded aggregates and recycled glass. The combined components provide a high performance mortar, which can be used for depths of 10-50mm in one pass. If necessary, greater depths can be achieved by using a layer-uponlayer method.

The trial in the Pen y Clip Tunnel on the A55 trunk road was carried out to assess its performance at a location featuring sustained high traffic volumes.

The product offers early tensile strengths that provide significant resistance to heavy traffic volumes.

For more information on companies in this article

Related Content

  • New M90 surfacing in the UK gain praise
    January 8, 2013
    Early evaluation of surfacing work on the M90 at Rosyth – the first major application of Scotland’s new TS2010 specification – has earned positive praise. Transport Scotland’s determination to obtain pavement that is durable, long lasting and safe (especially in early life) is clearly apparent on the M90 just north of the Forth Road Bridge. Here surfacing has been carried out this spring to TS2010, a tough new specification designed to ensure thin surfacing pavements that work. And the initial prognosis is
  • Building green with nanotechnology
    June 23, 2021
    The results are out: Iterchimica and Directa Plus’ GiPave combines recycled plastic and nanotechnology to improve pavement performance across the board
  • Tunnel waterproofing solutions
    February 29, 2012
    Tunnels are the highest value assets on a highway, making their operation, safety and maintenance of paramount importance. Patrick Smith reports
  • The role of anti-stripping agents in asphalt performance
    November 25, 2016
    Anti-stripping agents are often overlooked when boosting the performance of asphalt, according to Italian road chemicals producer Iterchimica