Skip to main content

Envirobed's Welsh roads test

A NOVEL resin alternative has been used to repair roads in North Wales in the UK. The product, supplied by Ultracrete, has been used to provide a durable, high-strength ironwork reinstatement. The cement-based resin alternative material, Envirobed HA104, was tested by the North Wales Trunk Road Agency. Resins have traditionally been the first choice for ironwork reinstatement, due to their high performance and rapid set times. Until now it had always been difficult to match the same performance charac
February 14, 2012 Read time: 2 mins
Long lasting repair performance is claimed for the new Ultracrete system
A NOVEL resin alternative has been used to repair roads in North Wales in the UK. The product, supplied by 2492 Ultracrete, has been used to provide a durable, high-strength ironwork reinstatement. The cement-based resin alternative material, Envirobed HA104, was tested by the 2312 North Wales Trunk Road Agency.

Resins have traditionally been the first choice for ironwork reinstatement, due to their high performance and rapid set times.

Until now it had always been difficult to match the same performance characteristics using an alternative material. However this new product is a revolutionary, next generation, environmentally friendly bedding mortar alternative to resin-based materials.

It is supplied as a two-component system which contains a blend of special cements, polymer-graded aggregates and recycled glass. The combined components provide a high performance mortar, which can be used for depths of 10-50mm in one pass. If necessary, greater depths can be achieved by using a layer-uponlayer method.

The trial in the Pen y Clip Tunnel on the A55 trunk road was carried out to assess its performance at a location featuring sustained high traffic volumes.

The product offers early tensile strengths that provide significant resistance to heavy traffic volumes.

For more information on companies in this article

Related Content

  • Compaction in the field
    July 31, 2012
    Special applications require stringent quality control and with compaction machines a key part of the paving process, their contribution can be vital. A high quality finish has helped athletes breaking sporting records on the track at the Shanghai Stadium in China during this year's 2008 Summer Olympic Games. Built in 1997 the stadium has been the venue for numerous major sporting events prior to the Olympics, however its track was showing signs of wear and the local authorities decided that a full refurbis
  • Busy UK motorway junction demolished in tight time frame – Mark Anthony reports
    October 18, 2012
    Military-style planning and overwhelming demolition firepower ensured that Armac Group avoided financial penalties and the wrath of drivers on one of the UK’s busiest motorway intersections. Demolition & Dismantling reports. 6 January is traditionally known for the visit of the three wise men to Bethlehem. However, on 6 January 2012, three wise demolition engineers from Armac Group was tasked with dismantling the monumental structure known as Catthorpe Viaduct: the main overbridge of the M6/M1/A14 interc
  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,
  • Glass bead safety concern
    February 17, 2012
    A study sponsored by the American Glass Bead Manufacturers' Association reveals that a growing number of imported glass bead products for highway markings exhibit high concentrations of heavy metals, including arsenic and lead.