Skip to main content

Efficient road paving logistics with new technology

A pilot project in Stuttgart suggests how the road construction site of the future may look in Germany. Coming requirements will mean more advanced road paving methods will be utilised.
April 6, 2020 Read time: 2 mins
Optimisation of the paving process can be achieved using the latest technology from Vögele

The local Ministry of Transport recently introduced the "Quality in Road Construction in Baden-Württemberg 4.0" (QSBW 4.0), which will be standard by 2021. The objective of QSBW 4.0 is a digitally controlled construction process that ensures paving quality and increases road surface life.

Invitations to tender based on QSBW 4.0 criteria will require technology associated with a digitally controlled and monitored job site. This comprises dynamic logistics and machine control, quality control and management, mobile networking, display options on smartphones, tablets or computers as well as the documentation of all data with access authorisation for clients.

Some solutions exist already, with one coming from Vögele in the shape of its advanced WITOS Paving Plus package. This integrated, software-based overall system for process optimisation and documentation comprises five connected modules for the parties involved, from the asphalt mixing plant and the truck driver to the construction manager.

With WITOS Paving Plus, contractors can meet requirements for pavers that will be specified in future in invitations to tender under QSBW 4.0.  

Temperature measurements are the focus of the quality control measures in QSBW 4.0. To ensure an optimum asphalt temperature, measurements are checked throughout the process. Meeting these requirements is easy with WITOS Paving Plus, since Vögele’s RoadScan temperature measurement solution can be integrated into the system. Using RoadScan, a high-precision infrared camera scans the specified area behind the screed of the paver, across a width of 10m.

In the project to rehabilitate a regional road, A Waggershauser Straßenbau was able to fulfil QSBW 4.0 by using the WITOS Paving Plus system. The QSBW 4.0 methodology was developed by the Ministry of Transport of Baden-Württemberg in collaboration with companies in the construction sector and summarised in a manual. 

For more information on companies in this article

Related Content

  • Delivering the smoothest road surfaces
    May 26, 2021
    Roads and highways have to be monitored and maintained regularly to ensure they are safe for use, and surface smoothness is a key factor for road quality. However, for racetracks (and airport runways) surface smoothness is even more important for safety and performance
  • Marini’s versatile asphalt plant for developing markets
    January 4, 2016
    Marini is offering a versatile new asphalt plant targeted at emerging markets – Mike Woof writes A new asphalt plant from Marini has been developed specifically for the needs of customers in developing countries. The company says that this is a high-quality asphalt plant but without the sophisticated technology required in developed markets such as Europe. The versatile BE Tower is designed to be easy to transport, install and then take apart and move to a different site when needed. The company has also
  • Ammann sets up partnership for digital construction future
    March 12, 2018
    Amman has teamed up with an Austrian firm to develop digital construction solutions. The Austrian construction process specialist hiQ solutions and the Ammann Group’s Digital Products team have established Q Point, which will provide an independent, open digital platform for the construction industry. The new firm, Q Point, is intended to increase construction efficiency and quality, while also cutting costs. The plan is to establish an open, manufacturer-independent platform that has open standards. This
  • Roadtec machines deliver Alaska runway rebuild
    January 26, 2017
    A challenging airport runway project in Alaska has been carried out with the help of Roadtec construction equipment equipped with Topcon machine control systems. Anchorage-based Knik Construction carried out the work at the airport in Yakutat, located in the southeast corner of Alaska. Bounded by the Gulf of Alaska to the South, mountains to the North, and coastal glaciers to the East and West, Yakutat is remote even for Alaska. There are no roads leading in or out and all commerce and access is by air o