Skip to main content

Cutting cracking of asphalt surfaces

The HUESKER Group says that it has a durable solution for asphalt reinforcement that can help combat road repair backlogs.
February 6, 2020 Read time: 2 mins
The properties of HUESKER’s HaTelit asphalt reinforcement offer key benefits even during on-site works

The firm’s HaTelit product can extend the service life of asphalt pavements, reducing the time it takes for reflective cracking to become a problem by a factor of four. Other benefits include shorter construction times and lower CO2 emissions from congestion around construction sites as a result.

The HaTelit asphalt interlayer product has been optimised since it was first introduced. It can lengthen maintenance intervals, reduce maintenance effort and cost, and cause less disruption.

Reflective cracking is one of the most common types of failure in asphalt road construction. Exposure to traffic loads, daily freeze-thaw cycles and seasonal temperature variations encourage the upward propagation of cracks in the base to the pavement surface. The infiltration of water and oxygen into the asphalt hastens the deterioration of the road condition. Standard rehabilitation methods for cracking in roads often involve renewal of the binder and surface courses. However, HaTelit simplifies the repair procedure: instead of milling off and replacing the binder course, a user can install the asphalt reinforcement directly on top of it. By taking up the tensile stresses and preventing overloading of the asphalt, the reinforcement grid delays existing cracks from propagating into the surface course.

Depending on the type and nature of the pavement to be repaired and the planned rehabilitation solution, the HUESKER Group recommends geosynthetic reinforcement products made from polyester (PET) or polyvinyl alcohol (PVA).

For more information on companies in this article

Related Content

  • Huesker introduces Basetrac as its new base reinforcement brand
    May 16, 2017
    Huesker Group has restructured its base reinforcement products under the new Basetrac brand. The established products Fortrac (biaxial), Fornit, Base, Duogrid, Comtrac, Sefitec and HaTe now form the Basetrac product family. Huesker said the restructure simplifies product selection and provides construction companies and transport engineers with single-source solutions for all application areas. The company said that all Basetrac products offer interaction flexibility, high reliability and cost-effectiveness
  • Bitumen technology ideal for road repairs
    July 4, 2012
    Mike Woof discusses some novel developments relating to bitumen In the developed countries of Western Europe there is an increasing shift away from new highway construction to maintaining and rebuilding existing roads. In Germany alone, a network of asphalt roads extending more than 600,000km will have to be maintained or repaired. Highway maintenance techniques do vary between European countries but some commonalities exist. There are techniques that have been sidelined in the last few years but which now
  • Bridge surface repair improves safety
    July 9, 2012
    Modern products are making life easier for those who have to look after bridges in need of repair Aproject to repair a bridge in the American state of Tennessee has brought safety benefits and improved the ride quality for drivers using the crossing. The Chickasaw Bridge spans the Ellington Parkway and it has benefited from a rehabilitation job by contractor Jamieson Construction. The roadway on the bridge was in a poor state and required frequent patching, and to tackle the problem, the Tennessee DOT consi
  • Developments in noise-reducing road surfaces
    February 17, 2012
    Mixtures with special additives are being produced for roads, offering noise reduction and aiding recycling. Patrick Smith reports. Noise-reducing road surfacings have been used in motorway construction for some time. But relatively new are noise-optimised surfacings used on roads in towns that do not follow a standard concept.Road trials with these materials have taken place in Germany since 2007 and have been prioritised due to the European Union Guidelines on the Assessment and Management of Environmenta