Skip to main content

Big production

High quality standards and high quality equipment have led to one company building a strong market share in a part of the US with high requirements on finish. The Pavement Maintenance Division of American Asphalt and Grading is based in Las Vegas, Nevada, but is highly active right across the states of California, Utah, Nevada and Arizona. This operation is run by Eric Reimschiissel and was established as a division from the parent company in 2001 and has since grown to have two paving/patching crews, two s
March 14, 2012 Read time: 3 mins
Las Vegas demands high quality standards for slurry seal repairs used on its streets
RSSHigh quality standards and high quality equipment have led to one company building a strong market share in a part of the US with high requirements on finish.

The Pavement Maintenance Division of American Asphalt and Grading is based in Las Vegas, Nevada, but is highly active right across the states of California, Utah, Nevada and Arizona. This operation is run by Eric Reimschiissel and was established as a division from the parent company in 2001 and has since grown to have two paving/patching crews, two slurry seal crews, four seal coat crews, a crack seal crew, and a striping crew. One of the crews laid over 4,690tonnes of black paving in a 10 hour period and the firm uses 360 VSS Macropaver to meet its high production needs, saying that these have proven productive, reliable and durable, as well as delivering high uptime and low downtime.

Quality is important in cities such as Las Vegas as Southern Nevada has many requirements from agencies that are stricter than other areas due to fast growth. Because Las Vegas is a major tourist attraction, the city expects streets and public lots to be in good condition. Reimschiissel said, "Officials will come out and look at a patch you do in the street. They are stricter than any other place I have worked." Some of the requirements for asphalt quality include neat seams and having to grind off oil spots. Crews also have to be neat and make sure nothing is left on the kerb line. "If you get anything on the curb line, you have to clean it off," Reimschiissel said. "Here they also have dust requirements." The firm has used the machines to good effect on a key contract in Las Vegas. "We were low bidders on the City of Las Vegas slurry seal project, which as far as I know is the largest slurry seal project ever bid in the nation," Reimschiissel said. "It's a five year renewable contract. They lay type 1, type 2, and type 3 slurries, mostly type 1 and type 2. They are laid on residential streets. We do somewhere between 10-20 streets a day." The firm carries out an array of services and solutions for asphalt pavement maintenance, including slurry seal, seal coating, crack sealing, asphalt paving, asphalt repairs, and pavement marking and striping. All in all, the operation lays some 293,000tonnes of asphalt on highways, city streets, subdivisions, and homeowner association streets, as well as paving commercial, industrial, and residential parking lots.

For more information on companies in this article

Related Content

  • Repair, recycling and warm mix technology at Italy’s Asphaltica exibition
    May 15, 2017
    As the name might suggest, the Asphaltica show in Verona, Italy was a good place to catch up on new ideas and applications for bitumen technology. Kristina Smith picked out a few highlights. Like many of its European neighbours, much of Italy’s road network is in dire need of love and attention. This was a constant theme for the Asphaltica show which was held alongside SaMoTer in Verona from 22-25 February. Speaking at the opening ceremony for the two shows, Michele Turrini, president of SITEB, which repres
  • New M90 surfacing in the UK gain praise
    January 8, 2013
    Early evaluation of surfacing work on the M90 at Rosyth – the first major application of Scotland’s new TS2010 specification – has earned positive praise. Transport Scotland’s determination to obtain pavement that is durable, long lasting and safe (especially in early life) is clearly apparent on the M90 just north of the Forth Road Bridge. Here surfacing has been carried out this spring to TS2010, a tough new specification designed to ensure thin surfacing pavements that work. And the initial prognosis is
  • Circuit of the Americas Formula for F1 success
    April 4, 2013
    In November 2012, the new Circuit of the Americas (COTA) in Austin, Texas, hosted the first ever Formula 1 US Grand Prix on a purpose-built track. But, as Jeff Winke and Guy Woodford report, the construction of COTA was just as demanding as competing in an F1 race itself For COTA construction contractor Austin Bridge & Road, L.P., nothing was more vital to the successful building of the 5.5km F1 track than meeting the strict criteria for its asphalt-paved surface. “The amount of stress this pavement will un
  • From Bangalore to Dumfries, plastic waste technology is reinforcing our roads
    May 2, 2018
    At last some good news about plastic waste: road authorities around the world are starting to use it in their roads - Kristina Smith reports.