Skip to main content

Asphalt paver proven in tough applications

BOMAG says that its new BF800 paver has now been well proven in tough working applications. The newly developed BF800 follows the same basic design principles of the smaller BF300 and BF600 models and weighs in at 20tonnes, with a maximum screed width of 2.5-10m. Extensive testing of the BF800 was carried out in an array of difficult operations and in late 2010 some 14,000tonnes of asphalt was laid in 3.5 days in 24-hour shifts to reconstruct the Brenner highway on the A22 near Bozen in northern Italy.
April 10, 2012 Read time: 2 mins
BOMAG's BF800 paver is designed for medium to large-scale construction projects on highways and major roads

172 Bomag says that its new BF800 paver has now been well proven in tough working applications.

The newly developed BF800 follows the same basic design principles of the smaller BF300 and BF600 models and weighs in at 20tonnes, with a maximum screed width of 2.5-10m. Extensive testing of the BF800 was carried out in an array of difficult operations and in late 2010 some 14,000tonnes of asphalt was laid in 3.5 days in 24-hour shifts to reconstruct the Brenner highway on the A22 near Bozen in northern Italy.

The tight time frame and the high demands placed on the finisher in terms of quality and productivity made for an interesting and challenging test. Over 50,000m² of highway was renewed with a 70mm asphalt binder course and a 40mm chip mastic asphalt.

Irregular delivery of material to site on this busy road led to unscheduled, traffic-related interruptions to work. Typically, stop-start paving can result in pavers lowering screeds onto the hot mat causing unevenness, a problem made worse by cooling of asphalt in front of the screed. High tolerances were achieved, with the result of a good surface finish.

For more information on companies in this article

Related Content

  • Austrian project focuses on paving quality
    April 1, 2014
    Work to improve a section of the busy A12 Inntal highway in Austrian Tyrol, Austria, has been carried out by contractor Strabag. The A12 is one of Austria’s busiest highways and carries heavy traffic volumes, particularly in summer when it is an important holiday route through to Southern Europe. The heavy traffic volumes mean that the road has to withstand high stresses. The Brixlegg branch of Strabag carried out a surface renovation contract on the 5.5km stretch between Kundl and Radfield and focussed on
  • Asphalt paving is seeing innovative new technology
    April 4, 2013
    With new machines coming to market, the asphalt paving sector is seeing an array of sophisticated technology now available
  • Tunisia road rebuild with BOMAG machines
    October 29, 2018
    Machines from BOMAG have played an important role in the rebuilding of an important road link in Tunisia
  • Podium finish for Indonesia’s new racetrack paver
    November 23, 2021
    The first machines to complete a circuit of Indonesia’s new Mandalika International motorsport track were a series of Bomag pavers and rollers. They can claim a best-in-class finish when it comes to creating the ultimate surface for a competitive racing track.