Skip to main content

Asphalt paver proven in tough applications

BOMAG says that its new BF800 paver has now been well proven in tough working applications. The newly developed BF800 follows the same basic design principles of the smaller BF300 and BF600 models and weighs in at 20tonnes, with a maximum screed width of 2.5-10m. Extensive testing of the BF800 was carried out in an array of difficult operations and in late 2010 some 14,000tonnes of asphalt was laid in 3.5 days in 24-hour shifts to reconstruct the Brenner highway on the A22 near Bozen in northern Italy.
April 10, 2012 Read time: 2 mins
BOMAG's BF800 paver is designed for medium to large-scale construction projects on highways and major roads

172 Bomag says that its new BF800 paver has now been well proven in tough working applications.

The newly developed BF800 follows the same basic design principles of the smaller BF300 and BF600 models and weighs in at 20tonnes, with a maximum screed width of 2.5-10m. Extensive testing of the BF800 was carried out in an array of difficult operations and in late 2010 some 14,000tonnes of asphalt was laid in 3.5 days in 24-hour shifts to reconstruct the Brenner highway on the A22 near Bozen in northern Italy.

The tight time frame and the high demands placed on the finisher in terms of quality and productivity made for an interesting and challenging test. Over 50,000m² of highway was renewed with a 70mm asphalt binder course and a 40mm chip mastic asphalt.

Irregular delivery of material to site on this busy road led to unscheduled, traffic-related interruptions to work. Typically, stop-start paving can result in pavers lowering screeds onto the hot mat causing unevenness, a problem made worse by cooling of asphalt in front of the screed. High tolerances were achieved, with the result of a good surface finish.

For more information on companies in this article

Related Content

  • Upgrades to Fort McMurray airport will aid Canada’s oil industry
    August 21, 2013
    Canada’s vast tar sands operation is providing a major financial boost to the country and this industry has relied heavily on Fort McMurray airport. Situated in Alberta, Fort McMurray is a remote town that has seen a huge expansion following the upturn in activity in the tar sands operations nearby. Although the massive resource has been worked for decades, only in the last 15 years or so have new extraction methods made the operation truly economic. Since 2010 Fort McMurray’s population has increas
  • New soil compactor launches from key manufacturers
    May 30, 2013
    Major manufacturers continue to develop new soil compactor models - Mike Woof reports. Innovations in machine design are being seen in the soil compaction sector from a number of major firms. As in other equipment sectors, new engine emissions legislation has played a huge role in driving the latest design changes. Europe, the US and Japan are rolling in the new Tier 4 Final/Stage IV legislation on noise and exhaust emissions which will be phased in across power output classes from the start of January 2014
  • Higher and higher: David Smith argues for more recycled asphalt
    May 16, 2017
    Debate continues to swirl around the use increased recycled asphalt for road surfaces. David Smith, development director at FM Conway urges more cross-sector work to prove the case for a higher recycled asphalt content. The use of recycled materials within our road network is well-established, but a persistent debate continues around the extent to which asphalt can be reused. Although increasing the proportion of recycled asphalt offers significant economic and environmental benefits, there remains a resist
  • Recycled asphalt cuts costs, maximises performance
    February 10, 2012
    The need to maximise road performance and cut costs has resulted in Indonesian contractors being keen to adopt cold recycling methods