Skip to main content

Asphalt paver proven in tough applications

BOMAG says that its new BF800 paver has now been well proven in tough working applications. The newly developed BF800 follows the same basic design principles of the smaller BF300 and BF600 models and weighs in at 20tonnes, with a maximum screed width of 2.5-10m. Extensive testing of the BF800 was carried out in an array of difficult operations and in late 2010 some 14,000tonnes of asphalt was laid in 3.5 days in 24-hour shifts to reconstruct the Brenner highway on the A22 near Bozen in northern Italy.
April 10, 2012 Read time: 2 mins
BOMAG's BF800 paver is designed for medium to large-scale construction projects on highways and major roads

172 Bomag says that its new BF800 paver has now been well proven in tough working applications.

The newly developed BF800 follows the same basic design principles of the smaller BF300 and BF600 models and weighs in at 20tonnes, with a maximum screed width of 2.5-10m. Extensive testing of the BF800 was carried out in an array of difficult operations and in late 2010 some 14,000tonnes of asphalt was laid in 3.5 days in 24-hour shifts to reconstruct the Brenner highway on the A22 near Bozen in northern Italy.

The tight time frame and the high demands placed on the finisher in terms of quality and productivity made for an interesting and challenging test. Over 50,000m² of highway was renewed with a 70mm asphalt binder course and a 40mm chip mastic asphalt.

Irregular delivery of material to site on this busy road led to unscheduled, traffic-related interruptions to work. Typically, stop-start paving can result in pavers lowering screeds onto the hot mat causing unevenness, a problem made worse by cooling of asphalt in front of the screed. High tolerances were achieved, with the result of a good surface finish.

For more information on companies in this article

Related Content

  • High reach excavator safety training launched
    April 11, 2012
    New demolition tolls are coming to market while safety training for high reach excavator operators has been establishe.d With the Intermat equipment exhibition due shortly, various manufacturers are offering new demolition tools to the market. Meanwhile the UK's National Federation of Demolition Contractors (NFDC) is now setting a lead in the sector by offering a high reach excavator training course. The NFDC has partnered with the National Demolition Training Group (NDTG) to develop the world's first train
  • High reach excavator safety training launched
    April 13, 2012
    New demolition tolls are coming to market while safety training for high reach excavator operators has been established With the Intermat equipment exhibition due shortly, various manufacturers are offering new demolition tools to the market. Meanwhile the UK's National Federation of Demolition Contractors (NFDC) is now setting a lead in the sector by offering a high reach excavator training course. The NFDC has partnered with the National Demolition Training Group (NDTG) to develop the world's first train
  • AP500E joins Cat paving range
    February 13, 2012
    Caterpillar Paving has added the AP500E wheel-type asphalt paver to its Paving Products machine family. The AP500E, when equipped with the new AS4252C electric heat screed, has an operating weight of 16,145kg, and features a Cat C4.4 engine with ACERT Technology that is European EU Stage IIIA engine emission-compliant. It also offers dual operating stations with Advisor display, tilting consoles, high capacity cooling system, belt-driven generator, and a special material handling system with independent con
  • Zambia road rebuild by mining firm
    May 30, 2017
    A key road rebuild contract has been carried out in Zambia by mining firm First Quantum Minerals (FQM). The firm used its own equipment to rebuild a road that connects with its mining operations in Zambia’s North-Western Province. The firm opted to maintain the Chingola-Solwezi road, which had deteriorated to such a state that North-Western Province faced being cut-off from the rest of the country during the rainy season. This was a serious issue for the mining firm as the poor state of the road threatened