Skip to main content

Asphalt paver proven in tough applications

BOMAG says that its new BF800 paver has now been well proven in tough working applications. The newly developed BF800 follows the same basic design principles of the smaller BF300 and BF600 models and weighs in at 20tonnes, with a maximum screed width of 2.5-10m. Extensive testing of the BF800 was carried out in an array of difficult operations and in late 2010 some 14,000tonnes of asphalt was laid in 3.5 days in 24-hour shifts to reconstruct the Brenner highway on the A22 near Bozen in northern Italy.
April 10, 2012 Read time: 2 mins
BOMAG's BF800 paver is designed for medium to large-scale construction projects on highways and major roads

172 Bomag says that its new BF800 paver has now been well proven in tough working applications.

The newly developed BF800 follows the same basic design principles of the smaller BF300 and BF600 models and weighs in at 20tonnes, with a maximum screed width of 2.5-10m. Extensive testing of the BF800 was carried out in an array of difficult operations and in late 2010 some 14,000tonnes of asphalt was laid in 3.5 days in 24-hour shifts to reconstruct the Brenner highway on the A22 near Bozen in northern Italy.

The tight time frame and the high demands placed on the finisher in terms of quality and productivity made for an interesting and challenging test. Over 50,000m² of highway was renewed with a 70mm asphalt binder course and a 40mm chip mastic asphalt.

Irregular delivery of material to site on this busy road led to unscheduled, traffic-related interruptions to work. Typically, stop-start paving can result in pavers lowering screeds onto the hot mat causing unevenness, a problem made worse by cooling of asphalt in front of the screed. High tolerances were achieved, with the result of a good surface finish.

For more information on companies in this article

Related Content

  • Productive milling on Japanese highway
    February 27, 2019
    A large milling machine from Wirtgen has been used to remove the top two asphalt layers of a key route in Japan in the city of Mito, around 140km north-east of Tokyo
  • Iterchimica trials more Gipave in Oxfordshire
    November 23, 2023
    Another trial of Iterchimica’s graphene-enhanced Gipave technology gets underway in the English county of of Oxfordshire.
  • Kosovo's award-winning green highway construction
    March 20, 2012
    A new highway is proving an economic lifeline for the tiny country of Kosovo – Mike Woof reports. Road projects in Europe rarely meet such widespread public approval and support as the new Route 7 highway being built in the new Balkan state of Kosovo. The first sections of the new road opened to traffic in November 2011, with locals turning out in large numbers to celebrate the event. The official opening was carried out by the country’s prime minister Hashim Thaçi, president Atifete Jahjaga, and members of
  • Key advances in asphalt compaction technology
    February 18, 2013
    A wide range of new models is being introduced for the asphalt equipment compaction market – Mike Woof reports. The asphalt compaction equipment market is seeing the introduction of new machines from an array of major manufacturers. Manufacturers have introduced both steel drum and rubber tyred rollers to meet customer demands in specific markets as well as globally, and have also developed innovative new compaction practices. Competition in the asphalt compaction market is increasingly tough, with many of