Skip to main content

Warm mix asphalt offers green solution

A new report from the UK highlights that utilising warm mix asphalt (WMA) can help cut CO2 emissions. The All-Party Parliamentary Group on Highways has issued a report highlighting how the use of WMA can reduce carbon emissions and improve efficiencies on highways projects. WMAs are manufactured and laid at lower temperatures than traditional asphalts, using less energy and delivering carbon savings without compromising performance. Their use can reduce CO2 emissions associated with asphalt production for
September 4, 2019 Read time: 3 mins

A new report from the UK highlights that utilising warm mix asphalt (WMA) can help cut CO2 emissions. The All-Party Parliamentary Group on Highways has issued a report highlighting how the use of WMA can reduce carbon emissions and improve efficiencies on highways projects.

WMAs are manufactured and laid at lower temperatures than traditional asphalts, using less energy and delivering carbon savings without compromising performance. Their use can reduce CO2 emissions associated with asphalt production for road maintenance and construction projects by around 15%, depending on product and plant.

The use of WMAs also improves conditions, as less time is needed to cool the newly laid surface to the temperatures that allow traffic to commence. This means that carriageways can be re-opened earlier, minimising disruption for road users. WMA already accounts for around 40% of production in the USA and over 15% in France, yet remains under-utilised in the UK, where it represents less than 4% of asphalt production.

Sir Christopher Chope OBE MP, chairman, APPG on Highways, said: “Everyone has a part to play in tackling environmental issues for future generations and the majority of UK councils have already declared ‘climate emergencies’1 . This report aims to encourage those authorities which have responsibility for highways to put their support for environmental measures into practice without delay.”

For contractors and clients alike, WMA offers an important solution as it allows for improved productivity, with crews able to lay more material in a single shift and still open to traffic on time. This can cut overall construction time, reduce traffic disruption for users, lower site costs, improve safety for site personnel and minimise fuel usage during production and construction.

Rick Green, Chair of the 1360 Asphalt Industry Alliance (AIA), said: “Warm Mix Asphalts can provide solutions to deliver long-lasting roads that also help to meet the country’s low carbon objectives. So far, take up in the UK has been frustrated by contract specifications and guidance which require prolonged processes for approvals and departure – it’s time to cut through these impediments so that highway authorities can seize the WMA opportunity.”

Richard Hayes, Institute of Highway Engineers (IHE) chief executive, said: “The use of Warm Mix Asphalts within the United Kingdom will significantly support the reduction in the carbon footprint of road surfacing. However, this is not the only benefit as WMA allows the new surface to the returned to traffic use much earlier thus reducing delays – a benefit that will be well-received by road users.”

The full report ‘Working for better roads – Warm Mix Asphalt: reducing carbon emissions and improving efficiencies’. It is available to download from the Highways APPG website %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external http://highwaysmaintenance.org false http://highwaysmaintenance.org/ false false%>


For more information on companies in this article

Related Content

  • Trimble’s VisionLink helps contractors view all their equipment
    January 6, 2017
    Trimble’s VisionLink, demonstrated at ConExpo 2014, shows how centralising and simplifying the management of on-site operations maximises efficiency, raises productivity and lowers costs for equipment fleets. The web-based application allows contractors to quickly and easily view all their equipment, regardless of make, in a secure, web-based application. Trimble says that VisionLink integrates site productivity, material quantities, and materials movement with asset and fleet management to give a holisti
  • Trimble’s VisionLink helps contractors view all their equipment
    January 23, 2014
    Trimble’s VisionLink, demonstrated at ConExpo 2014, shows how centralising and simplifying the management of on-site operations maximises efficiency, raises productivity and lowers costs for equipment fleets. The web-based application allows contractors to quickly and easily view all their equipment, regardless of make, in a secure, web-based application. Trimble says that VisionLink integrates site productivity, material quantities, and materials movement with asset and fleet management to give a holisti
  • ALARM Survey: UK maintenance backlog continues despite funding boost
    March 23, 2016
    Highways departments in England and Wales have yet to feel the benefit of the UK government’s commitment to spend €7.6 billion (£6 billion) on local road maintenance between 2015 and 2021. In fact, overall road budgets have dropped by 16%, according to the annual Local Authority Road Maintenance (ALARM) survey of highway bosses in England and Wales, conducted by the Asphalt Industry Alliance. This is reflected in the increase in average budget shortfalls – the difference between the money needed to ma
  • TRA 2018: pavement additives can stretch a road’s lifespan
    May 9, 2018
    Glass fibre and old tyres can help reduce road wear, according to recent research. Alan Dron reports from the Transport Research Arena – TRA 2018 – event in Vienna. Environmental issues were close to the heart of many presentations at this year’s event at the Reed Exhibition Messe in the Austrian capital from April 16-19. This included decarbonisation – such as making engines more environmentally friendly – and the challenge of digitalisation to create a more efficient transport system.