Skip to main content

Tarmac wins maintenance deal for UK’s A1(M)

Tarmac has won a major new highways maintenance contract extension for a key section of the UK’s busy A1(M) between Darrington and Dishforth.
October 18, 2019 Read time: 1 min
The firm was first appointed to the scheme in 2011. The company has won a new nine-year agreement, which extends the existing contract until 2028. Tarmac’s Highway Services business will continue to operate and maintain the section of the motorway in Yorkshire managed by Road Management Services (Darrington) Limited.

 

The contract will involve Tarmac continuing to deliver services including maintaining and resurfacing the highway. It will also include regular inspections, maintenance of bridges, pavements, drainage, motorway communications and environmental works such as grass cutting and landscaping.

The company will also be responsible for a comprehensive winter maintenance programme, the provision of 24-hour emergency response teams and reactive traffic management services.

The A1(M) motorway through Yorkshire forms part of a strategic link in the national network between Scotland, the north east and the south of England.

 

For more information on companies in this article

Related Content

  • Temporary bridge replacement in the US
    July 2, 2019
    A temporary bridge structure provided by Acrow Bridge is maintaining traffic flow for a key crossing in Vermont. The bascule bridge is allowing both vehicular and vessel traffic to pass during the reconstruction work to the North Hero-Grand Isle Drawbridge in Vermont. The US$60 million project involves replacing the historic twin leaf bascule bridge on Lake Champlain. This modular steel bascule bridge is allowing transport to continue to and from the Lake Champlain island towns of North Hero and Grand Isl
  • Mott MacDonald’s motorway to motorway metering
    December 20, 2017
    Mott MacDonald has developed a Motorway to Motorway (M2M) metering pilot scheme. This has been developed for Highways England and is being trialled between junction 21A of the M6 and junction 10 of the M62. The project is intended to smooth traffic flows and reduce the number of queues that occur because of congestion.
  • Record UK micro-surfacing using CAUTS
    August 28, 2020
    GripFibre uses Eurovia’s highly modified bitumen emulsion - Emulvia Grip P.
  • Pūhoi-to-Warkworth motorway project
    September 25, 2020
    After a hiatus because of the COVID-19 lockdown, work has restarted on what will be one of New Zealand’s most visually impressive motorways. Andrew Thackwray, senior manager for project delivery for Waka Kotahi, the New Zealand Transport Agency, explains