Skip to main content

Tarmac to complete a lap of Silverstone F1 track in the UK

UK contractor Tarmac will complete a resurfacing lap of the Silverstone Formula One track in time for the British Grand Prix in July. A highly durable asphalt solution will be laid over 20 days in June and which has been specifically designed to withstand the high demands and stresses of vehicles competing in professional racing series. The track, in Northamptonshire, England, will also hold the motorcycle GoPro British MotoGP Grand Prix in August. The work will be carried out under the guidance of in
May 9, 2019 Read time: 1 min
The quiet before the F1 storm at Silverstone in the UK: Tarmac to pave the circuit

UK contractor 2399 Tarmac will complete a resurfacing lap of the Silverstone Formula One track in time for the British Grand Prix in July.

A highly durable asphalt solution will be laid over 20 days in June and which has been specifically designed to withstand the high demands and stresses of vehicles competing in professional racing series. The track, in Northamptonshire, England, will also hold the motorcycle GoPro British MotoGP Grand Prix in August.

The work will be carried out under the guidance of international motorsport track expert Jarno Zaffelli, according to Paul Fleetham, managing director of Tarmac’s construction business. Zaffelli has been appointed by Silverstone as a contractor for the duration of the project and has been involved in planning the project since October

For more information on companies in this article

Related Content

  • Geosynthetics give extra strength to soil reinforcement
    March 14, 2012
    Using geosynthetics for soil reinforcement is highly effective but requires a high quality and trusted geogrid. When it comes to deciding which geogrid is best for a specific project, a number of product parameters must be taken into account. In the design of steep slopes, the most important parameter is the available long term design strength (Pdes). Recently, Colbond has significantly increased this factor for its high performance Enkagrid product, recognised with a newly updated BBA (British Board of Ag
  • Geosynthetics give extra strength to soil reinforcement
    May 3, 2012
    Using geosynthetics for soil reinforcement is highly effective but requires a high quality and trusted geogrid. When it comes to deciding which geogrid is best for a specific project, a number of product parameters must be taken into account. In the design of steep slopes, the most important parameter is the available long term design strength (Pdes). Recently, Colbond has significantly increased this factor for its high performance Enkagrid product, recognised with a newly updated BBA (British Board of Ag
  • Cost effective road maintenance
    February 8, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports. Road maintenance is an increasingly important industry that spans a worldwide market. Awareness of the need for a stable and sustainable international infrastructure, maintenance and creative rural road technologies are taking a stronger role as viable sources for a cost-effective means of preserving, developing and prolonging the life of roads wit
  • Hargreaves takes full Cat fleet
    November 12, 2012
    Hargreaves has made history by becoming the first mining project in Europe, Africa and the Middle East to invest in a total solution from the newly extended Caterpillar mining range. The seven year US$94.02million (£60mn) deal with Finning Equipment Solutions includes four new Cat 6030 hydraulic excavators and 19 777 Off Highway trucks, delivered earlier this year to the new Hargreaves’ Surface Mining Division for use at the Tower Colliery open cast mine site in Hirwaun, Rhondda Cynon Taff, South Wales. Fol