Skip to main content

Tarmac to complete a lap of Silverstone F1 track in the UK

UK contractor Tarmac will complete a resurfacing lap of the Silverstone Formula One track in time for the British Grand Prix in July. A highly durable asphalt solution will be laid over 20 days in June and which has been specifically designed to withstand the high demands and stresses of vehicles competing in professional racing series. The track, in Northamptonshire, England, will also hold the motorcycle GoPro British MotoGP Grand Prix in August. The work will be carried out under the guidance of in
May 9, 2019 Read time: 1 min
The quiet before the F1 storm at Silverstone in the UK: Tarmac to pave the circuit

UK contractor 2399 Tarmac will complete a resurfacing lap of the Silverstone Formula One track in time for the British Grand Prix in July.

A highly durable asphalt solution will be laid over 20 days in June and which has been specifically designed to withstand the high demands and stresses of vehicles competing in professional racing series. The track, in Northamptonshire, England, will also hold the motorcycle GoPro British MotoGP Grand Prix in August.

The work will be carried out under the guidance of international motorsport track expert Jarno Zaffelli, according to Paul Fleetham, managing director of Tarmac’s construction business. Zaffelli has been appointed by Silverstone as a contractor for the duration of the project and has been involved in planning the project since October

For more information on companies in this article

Related Content

  • Thailand road development planning
    May 2, 2019
    A group of experts from Thailand have been visiting the UK to research methods that would help boost road development. The planning and engineering team from Thailand’s Department of Rural Roads (DRR) have been holding meetings with UK counterparts about adopting a scheme similar to its Highways Authority Approval Scheme (HAPAS). The DRR has the responsibility for over 47,700km of Thailand’s 396,600km road network, upgrading paved and earth roads and delivering bridge projects. This is intended to boost so
  • The side effect – paving with a road widener
    December 13, 2018
    Sidewinder UK has been using its novel road widener machines on a series of paving jobs, including smart motorway projects. Sidewinder UK has carried out work on the M6 smart motorway contract between junction 16 and junction 19. The company used one of its road wideners to place and grade the final layer of sub-base to the balanced central reservation in readiness for Tarmac Contracting to pave the base and binder courses. An estimated 5,000tonnes of sub-base was used in the initial 6.4km x 4.7m wide st
  • India’s IRTE wins top Prince Michael of Kent Safety Award
    July 4, 2019
    India’s Institute of Road Traffic Education (IRTE) was among the international winners at the annual Prince Michael International Road Safety Awards in London. IRTE picked up the Premier Award for its road injury prevention programme and for being a key partner in the Safer Cars for India project established by Global NCAP, an independent certification body that evaluates the safety of vehicles. Part of IRTE’s strategy has been the setting up of what is believed to be Asia’s first Masters of Science i
  • Cold recycling with foamed bitumen – an innovative technique
    November 7, 2017
    The pressure to conserve materials in road construction means that resource-saving technologies are more in demand than ever before. Wirtgen’s cold recycling process is already proven and has the potential to meet future demand. Roads subjected to continuous and heavy traffic often show signs of damage that extend down to the road base. To eliminate this damage, the entire road needs structural rehabilitation. Full reuse of the milled material as well as its cost-effective treatment make cold recycling with