Skip to main content

Tarmac to complete a lap of Silverstone F1 track in the UK

UK contractor Tarmac will complete a resurfacing lap of the Silverstone Formula One track in time for the British Grand Prix in July. A highly durable asphalt solution will be laid over 20 days in June and which has been specifically designed to withstand the high demands and stresses of vehicles competing in professional racing series. The track, in Northamptonshire, England, will also hold the motorcycle GoPro British MotoGP Grand Prix in August. The work will be carried out under the guidance of in
May 9, 2019 Read time: 1 min
The quiet before the F1 storm at Silverstone in the UK: Tarmac to pave the circuit

UK contractor 2399 Tarmac will complete a resurfacing lap of the Silverstone Formula One track in time for the British Grand Prix in July.

A highly durable asphalt solution will be laid over 20 days in June and which has been specifically designed to withstand the high demands and stresses of vehicles competing in professional racing series. The track, in Northamptonshire, England, will also hold the motorcycle GoPro British MotoGP Grand Prix in August.

The work will be carried out under the guidance of international motorsport track expert Jarno Zaffelli, according to Paul Fleetham, managing director of Tarmac’s construction business. Zaffelli has been appointed by Silverstone as a contractor for the duration of the project and has been involved in planning the project since October

For more information on companies in this article

Related Content

  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f
  • Global growth in machine rental
    May 20, 2015
    The machine rental sector is undergoing significant expansion worldwide – Dan Gilkes reports. Plant hire, equipment rental, leasing, call it what you will, being able to use a machine when and where you need it, with no further concerns relating to ownership costs, depreciation or sudden repair bills, remains a compelling argument for many contractors. Which is one of the main reasons for the continued growth in popularity of equipment rental across the world. Rental has been big business in the UK, the US
  • Tarmac’s plan for cutting traffic disruption from roadworks
    October 19, 2020
    Tarmac has a cunning plan for cutting traffic disruption from roadworks.
  • How bitumen technology is helping roads do more
    November 14, 2016
    From lightening tunnels to keeping racing cars on tracks to preventing ice from forming, bitumen technology is helping roads do more - Kristina Smith reports If you think bitumen is just bitumen, useful for sticking lumps of aggregate together, it’s time to think again. The ever-widening and ever-more-sophisticated range of technologies and additives available means that we can ask our road surfaces to do more than ever.