Skip to main content

Tarmac to complete a lap of Silverstone F1 track in the UK

UK contractor Tarmac will complete a resurfacing lap of the Silverstone Formula One track in time for the British Grand Prix in July. A highly durable asphalt solution will be laid over 20 days in June and which has been specifically designed to withstand the high demands and stresses of vehicles competing in professional racing series. The track, in Northamptonshire, England, will also hold the motorcycle GoPro British MotoGP Grand Prix in August. The work will be carried out under the guidance of in
May 9, 2019 Read time: 1 min
The quiet before the F1 storm at Silverstone in the UK: Tarmac to pave the circuit

UK contractor 2399 Tarmac will complete a resurfacing lap of the Silverstone Formula One track in time for the British Grand Prix in July.

A highly durable asphalt solution will be laid over 20 days in June and which has been specifically designed to withstand the high demands and stresses of vehicles competing in professional racing series. The track, in Northamptonshire, England, will also hold the motorcycle GoPro British MotoGP Grand Prix in August.

The work will be carried out under the guidance of international motorsport track expert Jarno Zaffelli, according to Paul Fleetham, managing director of Tarmac’s construction business. Zaffelli has been appointed by Silverstone as a contractor for the duration of the project and has been involved in planning the project since October

For more information on companies in this article

Related Content

  • Advances in bitumen technology: new applications
    February 16, 2022
    This month, we look at four very different pavement technologies in four very different applications
  • Clever approach to reducing bridge vibrations
    November 14, 2013
    Reducing vibrations on a bridge, supplying high-quality binders to emerging countries and helping small and medium players with warm mix, this month’s stories showcase some innovative bitumen technology solutions - Kristina Smith reports The Kessock Bridge in the Highlands of Scotland has become the third bridge in the UK to be resurfaced with Gussasphalt. A dense mastic asphalt containing Nynas Endura N5, a polymer modified binder, Gussasphalt has been designed to have a longer life than standard mastic as
  • Durability is crucial while warm mix technology can help disaster recovery
    February 21, 2013
    Why durability is crucial for both emerging and developed economies, and how warm mix technology can help disaster recovery - Kristina Smith reports. When CORE Construction, a 100% owned Ghanaian company, started working on road construction projects five years ago, it was difficult to source the right bituminous mixes. “In the past, most construction firms had a number of challenges when it came to bituminous works, since the local capacity was not well-developed,” said CORE CEO Frank Lartey. CORE’s soluti
  • Iterchimica’s Gipave used in major UK road trial
    October 3, 2024
    This is the first time graphene-enhanced Gipave has been applied on the UK’s strategic road network - major highways and motorways - and follows ongoing trials on local roads.