Skip to main content

SuperPrixmat Ultra for Donington race track

Aggregate Industries completed the paving using its high-grip SuperPrixmat Ultra asphalt at the UK racing circuit just ahead of the British Superbike Championship last month.
By David Arminas June 8, 2023 Read time: 2 mins
Aggregate Industries’ supplied more than 5,000 tonnes of its high-grip SuperPrixmat Ultra asphalt, designed exclusively for motor racing circuits (image courtesy Aggregate Industries)

Construction materials supplier Aggregate Industries recently completed major resurfacing work at Donington Park race circuit, just ahead of the British Superbike Championship in May.

Essential and extensive track maintenance work included the removal and replacement of more than 6,500 tonnes of asphalt completed over 22 days. It represents the most significant improvement at the venue in almost 20 years, according to Aggregate Industries.  

Aggregate Industries worked with track-owners MotorSport Vision (MSV) and track designers Driven International as well as a complex supply chain. Provided were more than 5,000 tonnes of specially formulated high-grip SuperPrixmat Ultra asphalt, designed exclusively for demanding high-performance motor racing circuits. Aggregate Industries also provided 846 tonnes of binder course and 740 tonnes of stress-absorbing membrane interlayer, SuperSAMI.

The time-intensive project required Aggregate Industries to use two supply plants to maximise time and minimise disruption on-site during the 22-days of construction. This allowed for a continuous supply of asphalt to the site, enabling the team to lay the product at a consistent speed in echelon to achieve a jointless surface on the 4km (2.5 mile) track.

Aggregate Industries said that following the work, race officials noted an overall improvement to performance levels and circuit grip during the British Superbike Championship, resulting in the fastest laps set to date.

“The resurfacing of any major project requires meticulous planning and a true collaborative approach across all involved contractors. The resurfacing of Donington Park was no different,” said Vicky Smith, regional director for surfacing solutions at Aggregate Industries.

For more information on companies in this article

Related Content

  • Sophisticated resurfacing work
    January 7, 2022
    Sophisticated technology has been used to help resurface a racetrack in Italy
  • UK contractor operating sophisticated Benninghoven asphalt plant
    April 27, 2015
    A sophisticated Benninghoven asphalt plant is now in use by a UK contractor close to London - Mike Woof writes UK contractor FM Conway is now operating a second highly advanced asphalt plant in the London area. As with the first unit supplied a few years ago, the plant was designed and constructed to FM Conway’s specific needs by leading producer Benninghoven. This latest plant is located to the west of London (the earlier plant is to the east of the city) and close to Heathrow Airport. Being situated
  • Better roads through asphalt plant innovation
    August 19, 2014
    In Africa, one of the world’s fastest-growing cities is using the latest asphalt plant technology to boost its road maintenance work; while leading firms are finding their innovative solutions in demand in Europe and the Americas. Guy Woodford reports A new up to 180tonnes/hour Marini UltiMAP 2000 plant is helping Lagos State Public Works in Lagos, Nigeria implement a five-year strategic road map aiming to ensure high standards of road maintenance and improve infrastructural development across the city of m
  • Benningoven builds special plant for Norwegian firm
    August 18, 2015
    Benninghoven has built an asphalt plant specially to order for a customer in Norway. Contractor Veidekke had a tight timeframe in which the plant could be erected at the firm’s chosen site in Sörli, as well as specific requirements as to its configuration. Benninghoven was able to construct the special TBA 4000 UC asphalt mixing plant to the firm’s request. A notable feature of the plant is that its large capacity materials towers stand 33m high. The order was received in January 2014, with the plant the