Skip to main content

SaMoTer exhibition presents Cantiere Digitale

The 31st edition of Italy's SaMoTer construction equipment exhibition - in Verona from 3-7 May - will feature the Cantiere Digitale, the digital construction site.
By David Arminas April 10, 2023 Read time: 2 mins
The new and revolutionary high-tech LAB demo will feature Cantiere Digitale - The Digital Construction - a full-scale automated construction site set up in collaboration with Quelli del Movimento Terra

Road building takes centre stage in the SaMoTer LAB demo area at the forthcoming equipment exhibition in Verona, Italy.

Machinery and technologies will be hard at work for all to see. The big names will be there: CGT Caterpillar, Cenati, Hitachi Construction Machinery, Kiwitron, Develon (formerly Doosan), Dynapac-Fayat Group, Incofin, Komatsu, Leica Geosystems, Spring Machine Control, Topcon Positioning and SITECH-Spektra.
 
The new and revolutionary high-tech LAB demo will feature Cantiere Digitale - The Digital Construction Site. This is a full-scale automated construction site set up in collaboration with Quelli del Movimento Terra.
 
"SaMoTer Lab came about thanks to constant and continuous debate with the sector,” said Raul Barbieri, sales director of Veronafiere, the exhibition organiser. “This expressed the need for a venue specifically for technological displays, combined with updating, discussion and training opportunities. Samoter LAB consequently focuses on technological innovation, digitisation, de-carbonisation, safety and training. Cantiere Digitale - The Digital Construction Site is the natural outcome of all this, as a full-scale work place for cutting-edge machinery and technologies."

The Digital Construction Site will host typical construction site processes several times a day to highlight advantages in terms of productivity, quality and safety thanks to the use of these technologies.

Visitors attending SaMoTer will have the chance to watch 4.0 machinery and digital control technologies at work in the construction of road infrastructure across three strategic stages. There will be surveying with drones, GPS, scanners, mobile mapping and robotics. Design will be highlighted with the creation of a 3D project to ensure a flat and regular new road surface and start renovation work. Meanwhile, machine-to-machine interaction will be demonstrated.

SaMoTer is held alongside Asphaltica, the exhibition for road paving, safety and road infrastructure technologies and solutions. All this is promoted by and with SITEB-Strade Italiane & Bitumi.

For more information, please click on the SaMoter site.

For more information on companies in this article

Related Content

  • Asphalt milling and paving with 3D control
    February 16, 2012
    Milling and paving repair operations for airport runways require particularly high tolerances, an obvious market for 3D control solutions writes Mike Woof. Airport runways require some of the most accurate quality standards and tightest tolerances of any asphalt or concrete surface. This is one area where the high precision capabilities of 3D systems offer clear advantages.
  • Complete control of machines using technology
    December 12, 2019
    Sophisticated machine control technology has been utilised on heavy equipment to help deliver a challenging project in New Zealand
  • Traffex event agenda unveiled
    April 15, 2024
    The Traffex conference agenda has been unveil
  • New Bocimi Toll Road Aims to Reduce Travel Time and Boost Indonesia’s Economy
    April 20, 2023
    The Bogor-Ciawi-Sukabumi (Bocimi) toll road is a series of national strategic projects to help reduce traffic congestion along the existing factory-lined roadway, as well as enhance regional connectivity and tourism in West Java. Spanning 54 kilometers, the new highway corridor is expected to shorten travel time between the Bogor and Sukabumi provinces from two hours to 30 minutes and boost economic conditions in the surrounding Sukabumi area. Construction is divided into four phases, the first of which measures 15.35 kilometers and is already complete. PT Waskita Karya (Waskita) is the main contractor for the IDR 2.1 trillion second section, spanning 11.9 kilometers between Cigombong and Cibadak, and set for completion in 2023 after being delayed due to the pandemic.