Skip to main content

Rwanda to upgrade Mahama camp road

The successful bidder for project will be responsible for the design and construction of the road from Rusozi to the camp, as well as maintenance for three years.
By David Arminas December 19, 2022 Read time: 2 mins
A wide 14km-long dirt track, similar to this one, runs from Rusozi leads to the Mahama camp, home to thousands Burundian refugees since 2015 (image © Mogo Art/Dreamstime)

Rwanda is tendering for a 14 km road from Rusozi to the Mahama refugee camp road as part of its international obligation towards refugees.

The successful bidder for the Lot 1 project will be responsible for the design and construction of the road as well as maintenance for three years, according to Rwandan government documents. However, the maintenance cost of the last of the three years will be borne the central government.

The Mahama camp is in the Kirehe District within Rwanda's Eastern Province. There is currently a paved road up to the town of Rusozi from where it becomes a 7.5m-wide dirt track for the 14km to the camp, home to thousands Burundian refugees since 2015.

In 2021 there was estimated 125,000 refugees in Rwanda, despite 27,000 returning to Burundi. The vast majority of these were in Mahama and remain there today.

The road from Rusozi to Mahama is used by cars carrying food to Mahama camp and well as vehicles carrying construction materials, motorbikes, bicycles and ambulances – not mention hundreds of pedestrians. Accidents are all too frequent, according to government and non-government organisations helping refugees.

A large number of accidents occur during and right after heavy rains that can very quickly create large ruts in the track surface. There has been for many years concerted efforts by local residents and farmers to maintain sections adjacent to their properties.

Bidding will be done through the International Competitive Bidding Procedures as set out in World Bank regulations for its borrowers.

Deadline to submit the responses is January 20, 2023.

Related Content

  • Croatia rejects complaints over Peljeski Bridge tender
    April 6, 2018
    Croatia’s public procurement body has rejected complaints by all three international consortia over a winning low tender for the Peljeski bridge. Bids for construction of the four-lane 2.4km bridge were submitted in the middle of last year. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay. Vehicles must currently head from Croatia into Bosnia to re-enter a peninsula that is Croatian territory. Croatia’s State Commission for Control of Public Ordering Processes
  • Philippines pushes planned PPP programme
    February 24, 2012
    A number of key infrastructure projects will be carried out in the Philippines under the PPP model.
  • Rising to the challenge
    July 18, 2012
    Visualise today's concept of a major commercial traffic corridor in the western United States. A roadway responsible for delivering goods to Arizona, Nevada and Utah, that also connects Mexico to the United States to Canada through the North American Free Trade Agreement (NAFTA). What springs to mind? A multi-lane highway carrying thousands of vehicles a day past cities at speeds up to 113km/hour, while egress ramps make sure vehicles get safely to city streets and their final destination. This is not the c
  • Twinning Bribie Bridge is preferred option
    May 9, 2025
    The existing Bribie Island Bridge, near Brisbane, Australia, was opened in 1963 and consists of two traffic lanes and a narrow pedestrian pathway.