Skip to main content

Rwanda to upgrade Mahama camp road

The successful bidder for project will be responsible for the design and construction of the road from Rusozi to the camp, as well as maintenance for three years.
By David Arminas December 19, 2022 Read time: 2 mins
A wide 14km-long dirt track, similar to this one, runs from Rusozi leads to the Mahama camp, home to thousands Burundian refugees since 2015 (image © Mogo Art/Dreamstime)

Rwanda is tendering for a 14 km road from Rusozi to the Mahama refugee camp road as part of its international obligation towards refugees.

The successful bidder for the Lot 1 project will be responsible for the design and construction of the road as well as maintenance for three years, according to Rwandan government documents. However, the maintenance cost of the last of the three years will be borne the central government.

The Mahama camp is in the Kirehe District within Rwanda's Eastern Province. There is currently a paved road up to the town of Rusozi from where it becomes a 7.5m-wide dirt track for the 14km to the camp, home to thousands Burundian refugees since 2015.

In 2021 there was estimated 125,000 refugees in Rwanda, despite 27,000 returning to Burundi. The vast majority of these were in Mahama and remain there today.

The road from Rusozi to Mahama is used by cars carrying food to Mahama camp and well as vehicles carrying construction materials, motorbikes, bicycles and ambulances – not mention hundreds of pedestrians. Accidents are all too frequent, according to government and non-government organisations helping refugees.

A large number of accidents occur during and right after heavy rains that can very quickly create large ruts in the track surface. There has been for many years concerted efforts by local residents and farmers to maintain sections adjacent to their properties.

Bidding will be done through the International Competitive Bidding Procedures as set out in World Bank regulations for its borrowers.

Deadline to submit the responses is January 20, 2023.

Related Content

  • Ethiopia’s challenging cement market: consumption stimulation
    January 26, 2018
    Ethiopia’s cement industry has enjoyed substantial growth in the past decade. However, challenges linked to the government’s investment policy could erode these gains, as Shem Oirere reports With nearly 16.5 million tonnes of cement capacity and 10% average growth in annual consumption, Ethiopia is among the top cement producers in sub-Saharan Africa. Only Nigeria and South Africa rival it.
  • Colombia’s ANI agency is driving forward the 4G PPP programme
    April 4, 2016
    Andrade Moreno is a man on a mission. The head of Colombia's infrastructure agency ANI explains how the organisation is giving foreign companies increasing confidence to invest time and money in the country. David Arminas reports Change, especially when it touches the highest levels of South American business and politics, can bring with it personal danger. Luis Fernando Andrade Moreno, president of Colombia's National Infrastructure Agency - ANI - was aware of this when he took on the role in 2011. B
  • East Africa’s massive new ring road project
    June 30, 2016
    Plans are being drawn up for a major new highway project in East Africa. Preparations are being made by the authorities in Kenya, Uganda and Tanzania. The 450km ring road route runs around the shoreline of Lake Victoria and will provide better transport connections for Kenya, Uganda and Tanzania, as well as for other near neighbours, particularly Rwanda and Burundi. New border posts will be required, to help increase the flow of traffic between the nations. Although it will be complex, the project will boos
  • Podium finish for Indonesia’s new racetrack paver
    November 23, 2021
    The first machines to complete a circuit of Indonesia’s new Mandalika International motorsport track were a series of Bomag pavers and rollers. They can claim a best-in-class finish when it comes to creating the ultimate surface for a competitive racing track.