Skip to main content

Rwanda to upgrade Mahama camp road

The successful bidder for project will be responsible for the design and construction of the road from Rusozi to the camp, as well as maintenance for three years.
By David Arminas December 19, 2022 Read time: 2 mins
A wide 14km-long dirt track, similar to this one, runs from Rusozi leads to the Mahama camp, home to thousands Burundian refugees since 2015 (image © Mogo Art/Dreamstime)

Rwanda is tendering for a 14 km road from Rusozi to the Mahama refugee camp road as part of its international obligation towards refugees.

The successful bidder for the Lot 1 project will be responsible for the design and construction of the road as well as maintenance for three years, according to Rwandan government documents. However, the maintenance cost of the last of the three years will be borne the central government.

The Mahama camp is in the Kirehe District within Rwanda's Eastern Province. There is currently a paved road up to the town of Rusozi from where it becomes a 7.5m-wide dirt track for the 14km to the camp, home to thousands Burundian refugees since 2015.

In 2021 there was estimated 125,000 refugees in Rwanda, despite 27,000 returning to Burundi. The vast majority of these were in Mahama and remain there today.

The road from Rusozi to Mahama is used by cars carrying food to Mahama camp and well as vehicles carrying construction materials, motorbikes, bicycles and ambulances – not mention hundreds of pedestrians. Accidents are all too frequent, according to government and non-government organisations helping refugees.

A large number of accidents occur during and right after heavy rains that can very quickly create large ruts in the track surface. There has been for many years concerted efforts by local residents and farmers to maintain sections adjacent to their properties.

Bidding will be done through the International Competitive Bidding Procedures as set out in World Bank regulations for its borrowers.

Deadline to submit the responses is January 20, 2023.

Related Content

  • India’s longest tolled expressway is open to traffic
    January 2, 2013
    Earlier this year, a new expressway was opened to traffic in India, adding connectivity to the country’s road network - Mike Woof reports. India’s economic growth has fuelled a massive construction boom in the country. Road building has been set as a priority by the Indian Government to help ensure continued economic development and improve connectivity between major population centres. One major new expressway has recently opened to traffic, having been designed to international standards and provides insi
  • We're here to help
    July 16, 2012
    Formed at the end of the Cold War, the European Bank for Reconstruction and Development has raised, and loaned, billions to revitalise infrastructure from central Europe to central Asia as Patrick Smith reports One of the highlights of the year for Thomas Maier has been the recent trip to Bratislava, the capital of Slovakia, where history was made. As the Business Group director in charge of the infrastructure sector at the European Bank for Reconstruction and Development (EBRD) he was present when contract
  • Ukraine adopts international pricing standards
    December 14, 2022
    Despite the ongoing war, the country is moving ahead with contractual reforms for road works in line with western European norms, according to UNITE, the Ukrainian Infrastructure Association, a non-government agency.
  • Upgrading Poland's roads for UEFA 2012
    May 2, 2012
    Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to