Skip to main content

Russian highway route under construction

Construction work for the new highway in Russia, connecting Kemerovo with Leninsk-Kuznetsky, should be complete by mid-August 2019. Two overpasses for the 70km highway are being surfaced at present, while a river crossing is now being completed. The new highway will improve transport to Leninsk-Kuznetsky, cutting journey times for drivers.
April 26, 2019 Read time: 1 min

Construction work for the new highway in Russia, connecting Kemerovo with Leninsk-Kuznetsky, should be complete by mid-August 2019. Two overpasses for the 70km highway are being surfaced at present, while a river crossing is now being completed. The new highway will improve transport to Leninsk-Kuznetsky, cutting journey times for drivers.

Related Content

  • Road link upgrade in Costa Rica
    January 5, 2017
    A key road in Costa Rica has been upgraded and now features concrete construction CEMEX Latam Holdings, a subsidiary of CEMEX, supplied the cement needed for the project to upgrade a 50km stretch of the Inter-American Highway in Costa Rica.
  • New Russian bridge to span Volga
    July 6, 2020
    A new Russian bridge is planned to span the River Volga.
  • Colombian highway connections under construction
    April 9, 2014
    In Colombia work on the dual carriageway connecting Bogota and Buenaventura is now 40% complete. The link should be complete by the end of 2016. The Bogota-Girardot road is now opening, with excavation work still underway on the La Linea tunnel. The tunnel section of the project has been subject to delays arising from geological issues but when it is open, the tunnel will cut travel times and also improve safety over the existing route. The driving of the tunnel should be complete by September 2014 with the
  • Cost reductions on Russian highways
    July 12, 2012
    Major cost reductions are being seen on some key highway projects in Russia including the new ring road project in St Petersburg, where the reduction is US$192.31 million. The management of the ring road in St Petersburg has signed an agreement with the main contractors (Flora, the corporation Inzhtransstroy) to cut costs by 12-17.6% in 2009-2010. The 12% reduction is equivalent to US$32.05 million and will apply to contractors that are to complete facilities in 2009. Meanwhile the 17.6% cut is for work pla