Skip to main content

Rural road resurfacing to boost safety

Rebuilding a local road in southern Germany will provide users with a safer route, particularly in poor weather conditions. Black Forest-based contractor Waltersbacher has used a tracked AFT 500 asphalt paver from Ammann to resurface a local road in the municipality of Glatten, near Baiersbronn. The contractor has used a number of smaller Ammann compaction units in the past. So when it won the contract to upgrade the road the firm opted to buy the AFT 500 to handle this work, as well as other jobs r
October 21, 2016 Read time: 2 mins
The Ammann pavers have worked successfully on this local road application
Rebuilding a local road in southern Germany will provide users with a safer route, particularly in poor weather conditions.

Black Forest-based contractor Waltersbacher has used a tracked AFT 500 asphalt paver from 6791 Ammann to resurface a local road in the municipality of Glatten, near Baiersbronn.

The contractor has used a number of smaller Ammann compaction units in the past. So when it won the contract to upgrade the road the firm opted to buy the AFT 500 to handle this work, as well as other jobs requiring larger widths than its existing paver could handle.

To boost its adaptability for roadbuilding jobs, the contractor also decided to buy the optional bolt-on parts for extended widths. The machine now offers a maximum installation width of 6.5m. According to Ammann, the AFT 500 is available with a wide array of options and can be configured to meet customer needs. These options include wider or narrower paving widths than standard, electro-hydraulic adjustment of the roof profile, or heated lateral screed limiter plates.

Before using its asphalt paver, the contractor’s team had to tackle some preparatory work. Manhole covers and the surrounding areas were refurbished, and the kerbstones had to be regularised. This work was followed by pre-profiling of the damaged areas and milling operations for the carriageway connections.

An advantage of the AFT 500 for this job is that the machine starts and stops very gently, according to the contractor. The firm also said the paver can maintain a constant speed thanks to precise metering of the hydrostatic transmission, which is switched by variable pumps with an adjustable flow speed. Other benefits include the low filling height, which reduces spillage, as well as good all round visibility..

A total of 200tonnes of material was processed during the refurbishment project. The base and wearing course accounted for 20tonnes of material.

For more information on companies in this article

Related Content

  • Strabag on the edge with a Dynapac DF145CS paver from Atlas Copco
    June 10, 2015
    When asphalting the inside of the newly raised edge of a water dam, Austrian road construction company Strabag faced a challenge. The paver had to be operated at an angle of between 34-41 degrees with material fed into the hopper from a ledge just 2.8m wide on the edge of the dam. The Waldeck 2 kidney-shaped hydroelectric station is located on a mountaintop about 500m above sea level on Lake Eder in central Germany. The dam, owned by global energy group E.ON, has a perimeter of about 3km. An important pa
  • An array of crushing and screening innovations was presented at the recent INTERMAT 2012 exhibition
    July 19, 2012
    The crushing and screening phase is a crucial component in aggregate production and new development will help optimise performance - Mike Woof reports Crushing and screening is a key part of the quarrying cycle and has a huge impact on overall operating performance. Optimising operations will cut running costs, reduce materials wastage and also provide a more consistent product quality, boosting cost-effectiveness dramatically. An array of innovations were revealed to the market at the recent INTERMAT 2012
  • No strings attached: a Wirtgen SP 15i in Mobile
    May 9, 2019
    A Wirtgen slipform paver SP 15i operated fully automatically to produce kerbs near Mobile, in the US state of Alabama, as the company explains. When a new residential area is developed, the individual contract work sections are often very detailed. Roads and paths have to be paved and access roads to the individual plots constructed. Various traffic areas are often separated by concrete structures such as kerbs. These kerbs can be either pre-cast parts or monolithic profiles produced right on the job sit
  • Swell times for swale construction with a Sidewinder
    October 9, 2018
    Specialised swale construction featured in Northern England recently UK contractor Balfour Beatty examined different methods for building swales along the Norwich Northern Distributor Road near the English city of Norwich. Balfour decided to trial specialised road-widening machines, specially configured excavator buckets and modified compaction equipment. Excavators and dump trucks prepared the area for placement of sub-base material. The swale areas were constructed using both conventional methods as wel