Skip to main content

Rural road resurfacing to boost safety

Rebuilding a local road in southern Germany will provide users with a safer route, particularly in poor weather conditions. Black Forest-based contractor Waltersbacher has used a tracked AFT 500 asphalt paver from Ammann to resurface a local road in the municipality of Glatten, near Baiersbronn. The contractor has used a number of smaller Ammann compaction units in the past. So when it won the contract to upgrade the road the firm opted to buy the AFT 500 to handle this work, as well as other jobs r
October 21, 2016 Read time: 2 mins
The Ammann pavers have worked successfully on this local road application
Rebuilding a local road in southern Germany will provide users with a safer route, particularly in poor weather conditions.

Black Forest-based contractor Waltersbacher has used a tracked AFT 500 asphalt paver from 6791 Ammann to resurface a local road in the municipality of Glatten, near Baiersbronn.

The contractor has used a number of smaller Ammann compaction units in the past. So when it won the contract to upgrade the road the firm opted to buy the AFT 500 to handle this work, as well as other jobs requiring larger widths than its existing paver could handle.

To boost its adaptability for roadbuilding jobs, the contractor also decided to buy the optional bolt-on parts for extended widths. The machine now offers a maximum installation width of 6.5m. According to Ammann, the AFT 500 is available with a wide array of options and can be configured to meet customer needs. These options include wider or narrower paving widths than standard, electro-hydraulic adjustment of the roof profile, or heated lateral screed limiter plates.

Before using its asphalt paver, the contractor’s team had to tackle some preparatory work. Manhole covers and the surrounding areas were refurbished, and the kerbstones had to be regularised. This work was followed by pre-profiling of the damaged areas and milling operations for the carriageway connections.

An advantage of the AFT 500 for this job is that the machine starts and stops very gently, according to the contractor. The firm also said the paver can maintain a constant speed thanks to precise metering of the hydrostatic transmission, which is switched by variable pumps with an adjustable flow speed. Other benefits include the low filling height, which reduces spillage, as well as good all round visibility..

A total of 200tonnes of material was processed during the refurbishment project. The base and wearing course accounted for 20tonnes of material.

For more information on companies in this article

Related Content

  • Multiple milling machines removing surface
    April 24, 2019
    Milling subcontractor Pavement Recycling Systems removed thousands of tonnes of reclaimed asphalt pavement (RAP) from a runway at Oakland International Airport in California recently. The firm used a fleet of six Wirtgen W 210i cold milling machines to remove the asphalt in less than 60 hours from Runway 12-30, along the shore of San Francisco Bay. In total, 47,000tons of asphalt were milled within a 60-hour time frame, nonstop day and night, plus a single-shift second phase a week later. The firm start
  • Foaming option
    July 16, 2012
    Foamed bitumen is a versatile and cost-effective tool in recycling roads - Mike Woof reports Wirtgen hopes to capitalise on the growing demand for materials recycling and its range of solutions for this sector has expanded considerably in recent times. The firm has been taking advantage of further developments in foamed bitumen technology to offer an array of cost-effective road repair solutions. The range allows this material to be used in array of cold recycling applications and Wirtgen also offers labora
  • Brazilian contractor uses novel methods for high quality road
    January 5, 2015
    Cold-in place recycling method provides fast road rebuild in Brazil In Brazil a road contractor has carried out a high quality road rebuilding job, using novel techniques. Contractor Brown Brown is located in Santa Teresinha in the state of Bahia and recently carried out a two-week job for the company to rehabilitate sections of highway BR-381. The highway is an important route in Brazil and runs from Sao Paulo to Belo Horizonte. Highway BR-381 or Rodovia Fernão Dias, as it is called, stretches some 576km
  • Drum steer compactors introduced
    April 6, 2023
    One notable development at bauma 2022 was the introduction of new drum steer compactors by several key manufacturers