Skip to main content

Rural road resurfacing to boost safety

Rebuilding a local road in southern Germany will provide users with a safer route, particularly in poor weather conditions. Black Forest-based contractor Waltersbacher has used a tracked AFT 500 asphalt paver from Ammann to resurface a local road in the municipality of Glatten, near Baiersbronn. The contractor has used a number of smaller Ammann compaction units in the past. So when it won the contract to upgrade the road the firm opted to buy the AFT 500 to handle this work, as well as other jobs r
October 21, 2016 Read time: 2 mins
The Ammann pavers have worked successfully on this local road application
Rebuilding a local road in southern Germany will provide users with a safer route, particularly in poor weather conditions.

Black Forest-based contractor Waltersbacher has used a tracked AFT 500 asphalt paver from 6791 Ammann to resurface a local road in the municipality of Glatten, near Baiersbronn.

The contractor has used a number of smaller Ammann compaction units in the past. So when it won the contract to upgrade the road the firm opted to buy the AFT 500 to handle this work, as well as other jobs requiring larger widths than its existing paver could handle.

To boost its adaptability for roadbuilding jobs, the contractor also decided to buy the optional bolt-on parts for extended widths. The machine now offers a maximum installation width of 6.5m. According to Ammann, the AFT 500 is available with a wide array of options and can be configured to meet customer needs. These options include wider or narrower paving widths than standard, electro-hydraulic adjustment of the roof profile, or heated lateral screed limiter plates.

Before using its asphalt paver, the contractor’s team had to tackle some preparatory work. Manhole covers and the surrounding areas were refurbished, and the kerbstones had to be regularised. This work was followed by pre-profiling of the damaged areas and milling operations for the carriageway connections.

An advantage of the AFT 500 for this job is that the machine starts and stops very gently, according to the contractor. The firm also said the paver can maintain a constant speed thanks to precise metering of the hydrostatic transmission, which is switched by variable pumps with an adjustable flow speed. Other benefits include the low filling height, which reduces spillage, as well as good all round visibility..

A total of 200tonnes of material was processed during the refurbishment project. The base and wearing course accounted for 20tonnes of material.

For more information on companies in this article

Related Content

  • Road milling advances from key players
    January 30, 2020
    Major manufacturers have introduced key innovations in milling, recycling and stabilisation
  • Efficient road maintenance with Simex
    October 1, 2022

    Simex at Bauma Munich from 24 to 30 October, Hall C5, Booth 325.

    Bauma Munich – the most anticipated trade fair event in terms of strategic importance, turnout, new product launches and media impact for the earthmoving sector – has always been an opportunity for Simex to show to its partners and users its technical quality. The ability to innovate and do research, combining the new models in the range with new technological concepts, it’s the Simex way to outline the paths to be followed in the future.

  • VIDEO: Multiple pavers for Netherlands air base
    August 2, 2016
    A large fleet of asphalt road construction machines has been used at the Eindhoven Airbase in the Netherlands to reconstruct the runway.

    Contractor 7456 BAM Infra carried out the work to resurface the runway to the tight specifications and tight time frame requirements of the Royal Dutch Airforce.
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.