Skip to main content

Road works in Krasnodar, Russia

Road works are being planned in Krasnodar, Russia.
By MJ Woof August 18, 2020 Read time: 1 min
New road works planned for Krasnodar, Russia - image © courtesy of Mohamed Osama, Dreamstime.com

Road improvement and upgrade works are being planned in Krasnodar, Russia. New road links and road surfacing work will be carried out under the plans, with 32 separate contracts being considered.

A budget of US$292.7 million has been set for the works, which will extend for a total distance of 55km. Between 2017 and 2019 some 222km of roads were resurfaced in Krasnodar. The aim is ensure that 85% of roads in Krasnodar meet standards.

In addition, work is starting on the Krasnodar bypass, which will be 51km in length and feature four bridges, 20 overpasses and three major interchanges.

Related Content

  • South Africa road repair deals for contractors
    March 13, 2018
    A series of road repair contracts are being carried out now in South Africa. Bakwena, a road construction and maintenance firm, is maintaining and upgrading road infrastructure along the 385km of the N1N4 in a deal worth US$84.6 million. Meanwhile the contractor Raubex Construction is working on a $49.22 million project for a new link between the M17 and R512 routes. In addition, Raubex Construction is carrying out $4.65 million of improvement works on the R511 interchange. Resurfacing of a stretch of the
  • $152 million SC interchange project for Webuild
    February 28, 2025
    Webuild is carrying out a $152 million interchange project in South Carolina.
  • €17 billion for military road upgrades
    August 8, 2025
    Europe will invest €17 billion in roads to handle heavy for military traffic.
  • Lighting innovations boosting brightness, cutting costs
    January 27, 2014
    CU Phosco’s new P850 LED main road lantern has just seen its first major deployment – between Junctions 16 and 17 of the A55, a strategic road which skirts the North Wales coastline – Jason Barnes reports The A55 is a grade-separated dual carriageway also known as the North Wales Expressway. Some 139km long, it originally ran from Chester to Bangor but was extended across the Isle of Anglesey into Holyhead Docks in 2001 under a project part-funded by the European Union.