Skip to main content

Noise reducing pavement for Motorring 3?

The Danish parliament has ordered noise reduction studies to be done on the Motorring 3 motorway near the capital Copenhagen.
By David Arminas January 29, 2024 Read time: 2 mins
To widen or improve noise reduction along the busy Motorring 3 near Copenhagen? (image © Rolandm/Dreamstime)

The Danish road authorities are considering using a noise reducing pavement, similar types in Germany and the Netherlands, on Copenhagen’s busy Motorring 3.

The Danish parliament has said it will considering improving the noise reduction systems along Motorring 3 rather than spending money on widening the busy motorway from four to six lanes.

The 19km-long Motorring 3, west of the capital, connects the Helsingør motorway with the Køge Bugt motorway and is part of the European roads E47  and E55. Around 48,000 vehicles used the highway daily in 1990, rising to about 130,000 in recent years, according to data from Vejdirektoratet, Denmark’s national road directorate.

Around €48 million was set aside for extending the Motorring 3, a project that has now been put on hold, according to a report in the Danish engineering newspaper Ingenioren. The idea was to make the hard shoulder, or emergency land, into a live running lane, as well as a reduction in speed from 110kph to 90kph, the newspaper noted.

Instead, three noise-reduction methods will be studied: extension of the existing noise barriers, an updated more modern physical noise barrier to be built in the middle section of the motorway and a type of new noise-reducing asphalt already used in Germany and the Netherlands.

The noise reduction study must be completed by mid-2024 and then a final decision will be made on what the earmarked money will be must be used.

For more information on companies in this article

Related Content

  • How waste plastic and soybean oil are helping our roads last longer
    April 13, 2018
    A new super-modifier is born from waste plastic in Italy and a soybean-based rejuvenator from the US spreads from its home market. By Kristina Smith The two bitumen technologies featured this month come from almost opposing sources. One emerges from the human-created plastic waste plaguing our planet, the other from a plant. However, both technologies have been created with the same aims: to increase the life of roads, saving cost and ultimately reducing the impact of road building on the planet. A coll
  • IRF Executives Talks: shaping the future of Intelligent transportation
    August 29, 2024
    Technological advances for the intelligent transportation sector are developing at incredible speed globally. For many leaders in the sector, one of the biggest challenges is how they should use new technology to shape the future of intelligent transportation. SWARCO chief executive, Michael Schuch, put forward his ideas in conversation with IRF Director General Susanna Zammataro ahead of the IRF World Congress in Istanbul in October.
  • Durable surface solution
    February 22, 2012
    Innovative spray pavers from Vögele have been used in Germany to rehabilitate a section of the A99 autobahn near Munich. In all, four SUPER 1800-2 pavers fitted with SprayJet Module were used to pave a thin, noise-reducing asphalt. overlay on spray seal on the A99 to the west of the Allach Tunnel. For pavement rehabilitation, this stretch of the busy orbital motorway near Munich could only be closed to traffic at night. The traffic volume on the A99 orbital motorway near Munich is 100,000-120,000 vehicles/d
  • Mumbai’s new coastal transport link
    July 6, 2022
    Mumbai’s new coastal road presents an ambitious and challenging project that will help improve the lives of the city’s inhabitants - Mike Woof writes