Skip to main content

Noise reducing pavement for Motorring 3?

The Danish parliament has ordered noise reduction studies to be done on the Motorring 3 motorway near the capital Copenhagen.
By David Arminas January 29, 2024 Read time: 2 mins
To widen or improve noise reduction along the busy Motorring 3 near Copenhagen? (image © Rolandm/Dreamstime)

The Danish road authorities are considering using a noise reducing pavement, similar types in Germany and the Netherlands, on Copenhagen’s busy Motorring 3.

The Danish parliament has said it will considering improving the noise reduction systems along Motorring 3 rather than spending money on widening the busy motorway from four to six lanes.

The 19km-long Motorring 3, west of the capital, connects the Helsingør motorway with the Køge Bugt motorway and is part of the European roads E47  and E55. Around 48,000 vehicles used the highway daily in 1990, rising to about 130,000 in recent years, according to data from Vejdirektoratet, Denmark’s national road directorate.

Around €48 million was set aside for extending the Motorring 3, a project that has now been put on hold, according to a report in the Danish engineering newspaper Ingenioren. The idea was to make the hard shoulder, or emergency land, into a live running lane, as well as a reduction in speed from 110kph to 90kph, the newspaper noted.

Instead, three noise-reduction methods will be studied: extension of the existing noise barriers, an updated more modern physical noise barrier to be built in the middle section of the motorway and a type of new noise-reducing asphalt already used in Germany and the Netherlands.

The noise reduction study must be completed by mid-2024 and then a final decision will be made on what the earmarked money will be must be used.

For more information on companies in this article

Related Content

  • Recycling highway material reduces waste and costs
    March 15, 2012
    The use of specialist equipment to produce hydraulically bound mixtures can save 30-40% on the cost of landfill and backfill it is claimed. The transportation and removal of old material from certain highway projects has long been a problem for contractors. But David MacLynn believes that the answer, in many instances, could lie in the use of hydraulically bound mixtures (HBM), which he says can save between 30-40% on the cost of landfill and backfill.
  • Bentley Systems is advancing construction software technology
    January 15, 2016
    Bentley Systems has unveiled a wealth of new construction software technologies that can help optimise the progression of road projects - Mike Woof writes A host of new tools and software developments from Bentley Systems will help designers and construction firms deliver projects more quickly and efficiently. Senior vice president for Bentley Systems is Bhupinder Singh and he explained, “Our users are using more software and more devices than ever before and they’re creating more data.” He said that
  • Rebuilding the Human Dimension
    June 18, 2012
    We meet with Dr. Essam Sharaf, the former Prime Minister of Egypt, who has been honoured as IRF Personality of the Year for 2011 On 28 March, at a moving ceremony packed with IRF friends and delegates from all over the world, the IRF Personality of the Year Award for 2011 was formally presented to Dr. Essam Abdel-Aziz Sharaf. Discerned annually since 1951, the Award honours individuals universally acknowledged as having made particularly inspirational contributions to the fields of road infrastructure and
  • Reading marks out Meon’s ECO ES RoadLiner
    February 20, 2024
    For road marking duties, the English city of Reading has chosen Meon’s lithium-battery-powered ES RoadLiner, developed from the body of a Graco LineLazer ES 2000 and the drive unit of the LineDriver ES.