Skip to main content

Nepal's road network is developing

The Nepalese Government is pushing ahead with its road network improvement programme The government has managed to upgrade roads in 72 of the country’s 75 districts, despite the geographic challenges presented by its mountainous terrain and frequent steep slopes. One recent road revamp has been in Manang district where a new road has connected Chame with Besisahar and Lamjung. The link from Besisahar-Chame is 65km long, with plans in hand to surface a 35km stretch with asphalt over the next two years. Work
March 22, 2012 Read time: 2 mins
The Nepalese Government is pushing ahead with its road network improvement programme.

The government has managed to upgrade roads in 72 of the country’s 75 districts, despite the geographic challenges presented by its mountainous terrain and frequent steep slopes. One recent road revamp has been in Manang district where a new road has connected Chame with Besisahar and Lamjung. The link from Besisahar-Chame is 65km long, with plans in hand to surface a 35km stretch with asphalt over the next two years.

Work is underway on a 28.5km section although it is worth noting that 1.5km of the road will be particularly challenging due to steep slopes.

The Nepalese Army is carrying out the work and has requested the 2437 Ministry of Physical Planning and Works for a further US$510,000 to speed further progress. The Nepalese Government is also working on road links to other district headquarters such as Dolpa and Humla.

Related Content

  • England to upgrade concrete road surfaces
    April 13, 2021
    Concrete roads make up almost 650km - 4% - of England’s motorway and major A-road network.
  • Mozambique receives road funding
    February 16, 2012
    Mozambique's necessary infrastructure work will receive a boost from foreign loans.
  • Zambian road funds found
    February 7, 2012
    Zambia's Ministry of Works and Supply is budgeting US$273.24 million for its 2010 roads budget. Meanwhile a further $500 million is required for upgrades and maintenance of roads that have been damaged already.
  • Success of hot mix asphalt road recycling
    March 7, 2012
    Russian construction firm Kamdorstroy has carried out a successful demonstration of recycling techniques to over 60 highway officials, academics and contractors from all over the CIS states. The demonstration was carried out in co-operation with the Russian Federal Highway and Tatarstan Highway authorities and involved milling, recycling and overlaying a road with hot mix asphalt. The work was carried out on a 7.5m wide roadway with 3.8m wide lanes (with an overlap) using machinery and techniques new to Rus