Skip to main content

Nepal's road network is developing

The Nepalese Government is pushing ahead with its road network improvement programme The government has managed to upgrade roads in 72 of the country’s 75 districts, despite the geographic challenges presented by its mountainous terrain and frequent steep slopes. One recent road revamp has been in Manang district where a new road has connected Chame with Besisahar and Lamjung. The link from Besisahar-Chame is 65km long, with plans in hand to surface a 35km stretch with asphalt over the next two years. Work
March 22, 2012 Read time: 2 mins
The Nepalese Government is pushing ahead with its road network improvement programme.

The government has managed to upgrade roads in 72 of the country’s 75 districts, despite the geographic challenges presented by its mountainous terrain and frequent steep slopes. One recent road revamp has been in Manang district where a new road has connected Chame with Besisahar and Lamjung. The link from Besisahar-Chame is 65km long, with plans in hand to surface a 35km stretch with asphalt over the next two years.

Work is underway on a 28.5km section although it is worth noting that 1.5km of the road will be particularly challenging due to steep slopes.

The Nepalese Army is carrying out the work and has requested the 2437 Ministry of Physical Planning and Works for a further US$510,000 to speed further progress. The Nepalese Government is also working on road links to other district headquarters such as Dolpa and Humla.

Related Content

  • Bangladesh moves forward with US$735 million highways programme
    August 5, 2021
    A massive highways development programme is being planned in Bangladesh
  • Nepalese Government pushes ahead with transport infrastructure programme
    July 17, 2014
    The Nepalese Government has announced a major programme of transport infrastructure works for the 2014-2015 period. Road, highway and airport projects have all been prioritised. The detailed project report for the Kathmandu-Tarai Fast Track Road is to be completed within six months. The proposal aims to attract investors by guaranteeing a minimum number of vehicles using the tolled link. The project has been delayed due funding issues. This period will also see work being carried out the Mid-Hills Highway,
  • Nepalese highways will benefit from Chinese funding
    October 11, 2012
    The Chinese Government is providing neighbouring Nepal with expertise and funding for the ring road development around capital Kathmandu. This has been arranged through a bilateral agreement between the Chinese and Nepalese governments. The programme of works is getting under way and will see the widening of 27km of the ring road from its present four lanes to eight lanes in all. The Chinese Government funded the detailed survey design although the contractor has yet to be selected for the project.
  • Efficient earthmoving builds new road links
    February 7, 2012
    Efficient earthmoving is allowing productive road construction in the Egyptian desert, Mike Woof reports. Despite ferocious desert temperatures, efficient earthmoving operations will help build new road links in Southern Egypt. Close to the Egyptian city of Assuit, the contractor Orascom is working on three key desert highway projects that will provide vital transport connections for the country's growing economy.