Skip to main content

NAPA award to contractor Shelly & Sands

US contractor Shelly & Sands has won a key NAPA award.
By MJ Woof February 19, 2020 Read time: 2 mins
Contractor Shelly & Sands won a NAPA award for its work on I-77 in Ohio – image © Courtesy NAPA/Shelly & Sands

The National Asphalt Pavement Association (NAPA) gave the 2019 Sheldon G Hayes Award to contractor Shelly & Sands of Zanesville, Ohio. This was for excellence in construction of an asphalt pavement, for work for the Ohio Department of Transportation (ODOT) on Interstate 77 in Guernsey County, Ohio.

The Sheldon G Hayes Award has been given annually since 1971 and recognises the highest quality highway pavement works carried out in the US. The company received its award at a ceremony during the association’s 54th Annual Meeting in Maui, Hawaii.

“The asphalt pavement industry is committed to building high-quality projects that deliver superior performance to the traveling public,” said 2019 NAPA chairman John Harper. “All contractor’s projects earning a Sheldon G Hayes Award are measured against industry best practices, rated for smoothness a year after construction, and visually inspected to ensure the project lives up to our promise. I’m honoured to say that, in earning a 2019 Sheldon G Hayes Award, Shelly & Sands has exceeded these rigorous standards.”

Over the 8.4km-long I-77 project, Shelly & Sands milled the old pavement and placed new asphalt pavement mixture. As part of the project, the interchange with State Route 541 required complete rehabilitation and upgrading, including removal of old concrete pavement and replacing it with full-depth asphalt.

A 1.6km test section with a void-reducing asphalt membrane (VRAM), construction of a new bridge deck, and the need to begin paving in the middle of the project due to the scheduling of the bridge work were some of the challenges that Shelly & Sands needed to overcome on the project. Despite this, Shelly & Sands received full incentive payments for joint density and smoothness.

In partnering with ODOT, the project was one of the first pilot tests of a thermal imaging camera to monitor pavement temperature to identify thermal segregation from side to side across the mat. All data was shared with ODOT for research purposes.

This marks the second time in three years that Shelly & Sands has been a finalist or winner of the Sheldon G Hayes Award.

The award is named for Sheldon G Hayes, a founder of NAPA and the association’s first chairman. Hayes spent his entire career striving for better construction techniques and improvements in the quality of asphalt pavements.

Related Content

  • Advances in asphalt paving equipment coming to market
    June 27, 2018
    Some of the key manufacturers are improving asphalt paving technology with key developments to machines as well as the electronics and telematics systems fitted – Mike Woof writes. Several of the major asphalt paver manufacturers have unveiled new machines and systems that can optimise operations. Improved operating features for the BOMAG BF 800 C-2 paver are said to help increase its output and efficiency when working on-site. An important development is the new traffic light system, which helps improve co
  • Stirling Lloyd launches Bond Coat 3, part of the Eliminator series
    July 7, 2016
    Stirling Lloyd Polychem has introduced a cold, spray-applied bond coat that it says provides enhanced adhesion values and superior in-situ performance Bond Coat 3, part of the Eliminator bridge deck waterproofing system, “represents a significant development” in the provision of tack and bond coats that are used to adhere the asphalt surfacing to the waterproofing. It provides a fast-curing tack-free, durable protective finish that resists contamination and damage from traffic. It removes the risk of
  • Repaving an F1 racing circuit
    January 20, 2025
    The refurbishment of the Shanghai International Formula 1 was completed recently with great success. As an important milestone in the construction of racing facilities and modern high-grade roads in China, the project has attracted attention both inside and outside the industry.
  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main