Skip to main content

Kenya key road connection improvement work underway

Upgrade work is now underway on the B9 Isiolo to Mandera route connecting Kenya with neighbouring Somalia and Ethiopia.
September 13, 2019 Read time: 1 min

This 748km stretch of road will benefit from a new asphalt surface. The project is intended to help boost stability in the region, which has suffered from poor infrastructure and has been subject to attacks by rebel groups. The 1,200km journey from Kenya’s capital, Nairobi, to Mandera has typically taken two days by bus in good weather. However by improving the surface along the B9, the journey times will be reduced considerably. Mandera sits on the border with Somalia and Ethiopia, in Kenya’s north east, and upgrading the B9 will improve transport. However the road links in both Somalia and this area of Ethiopia are extremely basic, so barriers will remain to cross-border traffic.

Related Content

  • Safety risk if construction projects speed up
    February 27, 2012
    Many governments worldwide are using investment in infrastructure as a means to help tackle the current economic conditions. New highway construction, widening and repair contracts as well as bridge and tunnel projects that had been planned, are now being accelerated to help the industry and provide construction jobs.
  • Key Botswana road network gets an upgrade
    June 30, 2014
    Representing an investment of around US$113 million, Botswana’s A1 national road between Tonota and Francistown is undergoing a major upgrade This single-lane section is being progressively transformed into a north- and southbound dual carriageway, crossing four existing river bridges along the way. A strategically important transportation route for both Botswana and the southern African region, the A1 passes through Francistown, the nation’s second largest city, heading northwards to end at the Zimbabwe b
  • Bangladesh moves forward with US$735 million highways programme
    August 5, 2021
    A massive highways development programme is being planned in Bangladesh
  • Successful resurfacing at New York's JFK Airport
    February 8, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.