Skip to main content

In the fast lane

More than 500 million people worldwide watched the first Formula 1 motor race in India's history. The drivers were thrilled by the new asphalt circuit with its numerous bends and the peripheral area around the new race track at Greater Noida near the capital New Delhi, which were built by machinery from German company Vögele (a member of the Wirtgen Group).
May 14, 2012 Read time: 1 min
More than 500 million people worldwide watched the first Formula 1 motor race in India's history.

The drivers were thrilled by the new asphalt circuit with its numerous bends and the peripheral area around the new race track at Greater Noida near the capital New Delhi, which were built by machinery from German company 1194 Vögele (a member of the 364 Wirtgen Group).

Working with four Super 1800-2 pavers, the Vögele team helped construct the Buddh International Circuit. And the result of the first race on 30 October, 2011 saw the German Formula 1 world champion Sebastian Vettel breaking the first course record with a lap time of 1.27 minutes.

A demanding 5.1km circuit with 16 bends, a road varying between 18m-25m in width, superelevations up to 12% and gradients up to 10%, distinguishes this newcomer to the Formula 1 racing calendar, and demands considerable driving skill, offering optimum conditions for breathtaking overtaking manoeuvres. Full story next issue.

For more information on companies in this article

Related Content

  • Special mixes produced for a race track in Indonesia
    March 4, 2022
    International motorcycle racing has returned to Indonesia with help from asphalt plants supplied by Lintec & Linnhoff after a 24-year hiatus
  • Vögele sets paving record in German capital
    September 16, 2015
    Material transfer vehicles and remixing systems are crucial to delivering quality paving. Using material transfer vehicles (MTVs) can play a major role in delivering high quality road surfaces. These units can help boost quality by minimising the risk of material or thermal segregation. A major road paving project has been carried out in Germany using innovative paving methods. For the first time ever, binder and surface courses were paved over a width of 15.5m. This paving job was carried out on a 4.2km st
  • Attitude is key to sustainability, says Volvo CE’s Thomas Bitter
    June 27, 2018
    Whether you are in the global Volvo Ocean Race or working on-site locally, sustainability is about attitude as much as technology. David Arminas reports. Technology, sustainability and safety. We ignore these often related themes at our peril. This was the key point made by Volvo Group chief executive Martin Lundstedt during his brief opening presentation at the start of the Building Tomorrow Conference in Spain last October. The conference took place within the harbour of Alicante that was bustling wit
  • Wirtgen Group aims for €1.8bn 2012 sales and targets emerging markets
    September 25, 2012
    Wirtgen Group expects to achieve record net sales of €1.8 billion in 2012, according to joint company president Jürgen Wirtgen. The performance forecast for the German road building and quarrying equipment manufacturer – a slight rise on 2011 net sales of €1.76 billion – was revealed as Jürgen and brother and co-Wirtgen Group president, Stefan Wirtgen, told a press conference at the recent Wirtgen Mineral Technology Days event about the company’s sales push in emerging markets.