Skip to main content

In the fast lane

More than 500 million people worldwide watched the first Formula 1 motor race in India's history. The drivers were thrilled by the new asphalt circuit with its numerous bends and the peripheral area around the new race track at Greater Noida near the capital New Delhi, which were built by machinery from German company Vögele (a member of the Wirtgen Group).
May 14, 2012 Read time: 1 min
More than 500 million people worldwide watched the first Formula 1 motor race in India's history.

The drivers were thrilled by the new asphalt circuit with its numerous bends and the peripheral area around the new race track at Greater Noida near the capital New Delhi, which were built by machinery from German company 1194 Vögele (a member of the 364 Wirtgen Group).

Working with four Super 1800-2 pavers, the Vögele team helped construct the Buddh International Circuit. And the result of the first race on 30 October, 2011 saw the German Formula 1 world champion Sebastian Vettel breaking the first course record with a lap time of 1.27 minutes.

A demanding 5.1km circuit with 16 bends, a road varying between 18m-25m in width, superelevations up to 12% and gradients up to 10%, distinguishes this newcomer to the Formula 1 racing calendar, and demands considerable driving skill, offering optimum conditions for breathtaking overtaking manoeuvres. Full story next issue.

For more information on companies in this article

Related Content

  • Vögele introduces improved medium-sized paver
    January 6, 2015
    Vögele is offering high performance paving with its new machine - Mike Woof writes Vögele is introducing a new medium class tracked paver, the SUPER 1600-3i and its rubber tyred sibling, the SUPER 1603-3i. The company is also offering an update to its SprayJet package for paving thin overlays. Both the SUPER 1600-3i and SUPER 1603-3i share the benefits of the firm’s Dash 3 features, with the tracked machine able to handle paving widths up to 7.5m and the rubber tyred version offer a maximum width of 7m.
  • New asphalt pavers deliver better surface quality
    February 13, 2012
    Progressive paving improvements are offering better surface quality
  • Wirtgen fleet helps build Romanian road
    December 17, 2013
    A fleet of Wirtgen machines is helping build a section of a major highway in Romania, the Transylvanian Autostrada A3. This 588km road connects Romanian capital Bucharest with the Hungarian border and links to the Hungarian M4 highway. Plans for the A3 got the go-ahead in 2004 and the route runs via Ploieti, Braov, Sighioara, Târgu Mure, Cluj-Napoca, Zalau and Oradea to the Hungarian border, with completion scheduled for 2017.
  • Cost-saving benefits of dual layer asphalt paving
    February 14, 2012
    Sophisticated dual layer paving technologies currently on the market are said to offer major advantages to road builders. Roads built using twin layer, hot on hot paving techniques can last considerably longer than those constructed using conventional methods. Contractors and clients also stand to gain from savings on materials costs, through the elimination of the need for emulsion spraying between binder and wearing courses and with the use of thin layer wearing course designs. At present two paver man