Skip to main content

CH2M to rehabilitate Denver Airport aprons

Denver International Airport has awarded CH2M a contract for gate apron rehabilitation and drainage improvements. The three-year project encompasses professional engineering support and technical services for enhancements adjacent to concourses A, B and C. Included are pavement evaluations, replacement of deteriorating apron pavement, mitigation of apron drainage issues and ponding, as well as preventing water infiltration into concourse basements. Utility and infrastructure work includes installation
July 6, 2016 Read time: 2 mins
Denver International Airport has awarded CH2M a contract for gate apron rehabilitation and drainage improvements.

The three-year project encompasses professional engineering support and technical services for enhancements adjacent to concourses A, B and C. Included are pavement evaluations, replacement of deteriorating apron pavement, mitigation of apron drainage issues and ponding, as well as preventing water infiltration into concourse basements.

Utility and infrastructure work includes installation of a new drainage system, utility vault adjustments, demolition of baggage tunnels and dog houses, removal of de-icing tanks, replacement of sand-oil interceptors and replacement of grease traps.

Denver International, in the state of Colorado, is the sixth busiest US gateway by passenger traffic. CH2M programme manager Nick Rollo said that a critical success factor for the project will be coordinating construction activities with airlines, concessionaires, airport management and ground transportation to support ongoing flight operations.

CH2M has provided airfield engineering services to Denver International since it opened in 1995. More than 50 projects have been completed, including the design of two of the original runways as well as the runway number six.

Related Content

  • New airport for Papua New Guinea
    August 21, 2013
    A new airport has been constructed in the southern highlands of Papua New Guinea that will help with communications and logistics for the development of a natural gas project in the area. Built at Komo, the airport is sufficiently large to be able to handle the massive Russian Antonov AH-124-100 transport aircraft. Construction of the airport however proved challenging as the climate in this mountainous area is known for its changeable weather and heavy seasonal rainfall. However the airport was need
  • Benin airport job for Topcon’s RD-M1 scanner
    May 13, 2022
    A $16 million runway project at Cotonou Cadjehoun Airport needed Topcon Positioning’s RD-M1 road scanner to ensure precise milling and quality resurfacing.
  • Runway refurbishment at Leipzig/Halle airport
    May 4, 2022
    Leipzig/Halle airport in Germany is now benefiting from a newly rehabilitated runway as well as a number of taxiways
  • GRAA winning project profile: RJ122 Highway Rehabilitation
    June 24, 2013
    The State of Rio de Janeiro, Brazil administers a wide network of highways and is faced with a significant maintenance management challenge of how to best make improvements having a perdurable impact. The maintenance management for the project needed to be done at a reasonable cost and needed to be able to withstand a heavy traffic flow. To meet such challenges, the Rio de Janeiro selected project RJ122 to undertake a new type of maintenance strategy. The RJ122 highway is a unique paving project in the rece