Skip to main content

CH2M to rehabilitate Denver Airport aprons

Denver International Airport has awarded CH2M a contract for gate apron rehabilitation and drainage improvements. The three-year project encompasses professional engineering support and technical services for enhancements adjacent to concourses A, B and C. Included are pavement evaluations, replacement of deteriorating apron pavement, mitigation of apron drainage issues and ponding, as well as preventing water infiltration into concourse basements. Utility and infrastructure work includes installation
July 6, 2016 Read time: 2 mins
Denver International Airport has awarded CH2M a contract for gate apron rehabilitation and drainage improvements.

The three-year project encompasses professional engineering support and technical services for enhancements adjacent to concourses A, B and C. Included are pavement evaluations, replacement of deteriorating apron pavement, mitigation of apron drainage issues and ponding, as well as preventing water infiltration into concourse basements.

Utility and infrastructure work includes installation of a new drainage system, utility vault adjustments, demolition of baggage tunnels and dog houses, removal of de-icing tanks, replacement of sand-oil interceptors and replacement of grease traps.

Denver International, in the state of Colorado, is the sixth busiest US gateway by passenger traffic. CH2M programme manager Nick Rollo said that a critical success factor for the project will be coordinating construction activities with airlines, concessionaires, airport management and ground transportation to support ongoing flight operations.

CH2M has provided airfield engineering services to Denver International since it opened in 1995. More than 50 projects have been completed, including the design of two of the original runways as well as the runway number six.

Related Content

  • Jacobs and CH2M to merge in a US$3.27 deal
    August 3, 2017
    Global US infrastructure firm Jacobs Engineering Group and one of its main rivals, CH2M, are to merge under a US$3.27 billion deal. In a written statement, Jacobs said it will acquire all of the outstanding shares of CH2M in a cash and stock transaction, including around $416 million of CH2M debt. CH2M had global revenue in the past 12 months of around $4.4 billion and about 20,000 employees. Its contracts are in the water, transportation, environmental and nuclear sectors.
  • Speedy airport upgrade
    February 15, 2012
    Increases in flight numbers from the Frankfurt Hahn airport have resulted in necessary improvements to the facility, including new runway surfaces. The former German military airbase has been used as a civilian airport since 1993 but is now Germany's fifth largest air cargo hub and handles some 40,000 flights/year.
  • World’s largest bridge deck for KAIA expansion
    December 16, 2013
    A bespoke formwork solution from RMD Kwikform is playing a key role in creating the largest ever airport cast bridge deck as part of the multi-billion dollar expansion of King Abdulaziz International Airport near Jeddah, Saudi Arabia. The firm is also a leading player in the creation of arterial tunnels under the airport’s elevated roads, another key part of the project’s first phase works due for completion in 2014. Guy Woodford reports
  • AtkinsRéalis for Georgia transport resilience
    June 25, 2024
    AtkinsRéalis will develop strategies that integrate vulnerability assessment results into asset management systems with the goal of protecting the US state’s transportation network.