Skip to main content

CH2M to rehabilitate Denver Airport aprons

Denver International Airport has awarded CH2M a contract for gate apron rehabilitation and drainage improvements. The three-year project encompasses professional engineering support and technical services for enhancements adjacent to concourses A, B and C. Included are pavement evaluations, replacement of deteriorating apron pavement, mitigation of apron drainage issues and ponding, as well as preventing water infiltration into concourse basements. Utility and infrastructure work includes installation
July 6, 2016 Read time: 2 mins
Denver International Airport has awarded CH2M a contract for gate apron rehabilitation and drainage improvements.

The three-year project encompasses professional engineering support and technical services for enhancements adjacent to concourses A, B and C. Included are pavement evaluations, replacement of deteriorating apron pavement, mitigation of apron drainage issues and ponding, as well as preventing water infiltration into concourse basements.

Utility and infrastructure work includes installation of a new drainage system, utility vault adjustments, demolition of baggage tunnels and dog houses, removal of de-icing tanks, replacement of sand-oil interceptors and replacement of grease traps.

Denver International, in the state of Colorado, is the sixth busiest US gateway by passenger traffic. CH2M programme manager Nick Rollo said that a critical success factor for the project will be coordinating construction activities with airlines, concessionaires, airport management and ground transportation to support ongoing flight operations.

CH2M has provided airfield engineering services to Denver International since it opened in 1995. More than 50 projects have been completed, including the design of two of the original runways as well as the runway number six.

Related Content

  • Oman’s US$765mn Salalah airport project takes shape
    June 25, 2013
    New roads and bridges are part of the US$765 million Salalah International Airport project in Oman RMD Kwikform Oman has supplied Larsen & Toubro Oman with a shoring solution to support construction of the new airport, which, once complete, will cater services for up to 1 million passengers/year. The project will involve the construction of a passenger terminal building, an air traffic control tower, and eight ancillary buildings, roads, and bridges. Located in the southern region of Oman, Salalah is a popu
  • Scottish trial for OTT HydroMet’s ecoLog 1000
    April 25, 2022
    An OTT ecoLog 1000 water level logger with cellular data connection to Hydromet Cloud was trialled upon the Vales Burn Bridge in Scotland.
  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.
  • St Helena receiving airport upgrade
    June 30, 2014
    Two Liebherr machines, one LR 1200 crawler crane and one HS 895 HD duty cycle crawler crane, are currently employed in the construction of an international airport on Saint Helena. The island’s seclusion poses a particular challenge for this project Saint Helena, known as Napoleon’s last exile, is one of the oldest British colonies and is definitely one of the most remote places on earth. Located more than 2,000km from the African mainland in the South Atlantic Ocean, the British Overseas Territory Saint H