Skip to main content

CH2M to rehabilitate Denver Airport aprons

Denver International Airport has awarded CH2M a contract for gate apron rehabilitation and drainage improvements. The three-year project encompasses professional engineering support and technical services for enhancements adjacent to concourses A, B and C. Included are pavement evaluations, replacement of deteriorating apron pavement, mitigation of apron drainage issues and ponding, as well as preventing water infiltration into concourse basements. Utility and infrastructure work includes installation
July 6, 2016 Read time: 2 mins
Denver International Airport has awarded CH2M a contract for gate apron rehabilitation and drainage improvements.

The three-year project encompasses professional engineering support and technical services for enhancements adjacent to concourses A, B and C. Included are pavement evaluations, replacement of deteriorating apron pavement, mitigation of apron drainage issues and ponding, as well as preventing water infiltration into concourse basements.

Utility and infrastructure work includes installation of a new drainage system, utility vault adjustments, demolition of baggage tunnels and dog houses, removal of de-icing tanks, replacement of sand-oil interceptors and replacement of grease traps.

Denver International, in the state of Colorado, is the sixth busiest US gateway by passenger traffic. CH2M programme manager Nick Rollo said that a critical success factor for the project will be coordinating construction activities with airlines, concessionaires, airport management and ground transportation to support ongoing flight operations.

CH2M has provided airfield engineering services to Denver International since it opened in 1995. More than 50 projects have been completed, including the design of two of the original runways as well as the runway number six.

Related Content

  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • Olbia Airport upgrade work
    September 16, 2020
    Equipment from the Fayat Group has played an important role in the revamping of a busy airport on the Italian island of Sardinia
  • Major upgrade for Chicago O’Hare Airport
    August 14, 2015
    Internationally, airports are being upgraded and expanded to increase capacity and safety – Mike Woof writes. All around the world, airports are being expanded and upgraded, both to cope with massive increases in passenger numbers and also to handle larger aircraft. Runways have to be rebuilt with stronger structures and surfaces to handle greater air traffic volumes as well as increased loads from larger aeroplanes. Building airport runways, however, poses many challenges for construction crews. Paving qua
  • Giving four hours back to the day… and much more
    October 7, 2019
    A 20km long elevated expressway in Dhaka will be one of Bangladesh’s first Public Private Partnership transport projects – words and pictures by Ruby Kitching, on behalf of Mott MacDonald.