Skip to main content

ALARMing UK road statistics, from the Asphalt Industry Alliance

Within years, one in six of UK local roads will need repairs or face closure, according to the latest Annual Local Authority Road Maintenance – ALARM - survey. The cumulative effect of an ageing network, decades of underfunding, increased traffic and wetter winters has led to around 17% of all local roads reportedly in poor structural condition, with less than five years of life remaining. The 22nd annual ALARM survey is a comprehensive study into local road maintenance funding and conditions. Loca
March 27, 2017 Read time: 2 mins
Within years, one in six of UK local roads will need repairs or face closure, according to the latest Annual Local Authority Road Maintenance – ALARM - survey.

The cumulative effect of an ageing network, decades of underfunding, increased traffic and wetter winters has led to around 17% of all local roads reportedly in poor structural condition, with less than five years of life remaining.

The 22nd annual ALARM survey is a comprehensive study into local road maintenance funding and conditions.

Local authorities need at least nearly €14 billion to bring the network up to scratch – a figure that has remained largely unchanged for four years, according to the report. The gap between the amount local authorities received this year and the amount they say they need to keep their roads in reasonable order is almost €845 million.

Alan Mackenzie, chairman of the AIA, said that local authority highway teams lack the resources to arrest the decline in local road conditions. “Despite this, efficiencies they have achieved in recent years through adopting an asset management approach should be applauded.

“Working smarter, greater collaboration and improved communication are all contributing to their ability to do more with less, though of course there will come a point when there are no further efficiency savings to be found,” he said.

The report found that a large number of local authorities have also been hit with unforeseen costs - England: 43%; London: 53%; Wales: 56%. The primary reason is structural failures caused by adverse weather and increased traffic.

The number of potholes filled over the past year has dropped again for the second successive year, but is still high at 1.7 million – one repaired every 19 seconds.

The 2017 edition was completed by 63% of authorities responsible for roads in England and Wales and was carried out during January and February. The survey is commissioned by the 1360 Asphalt Industry Alliance (AIA) which represents companies producing raw materials used in asphalt for roads and is collated, analysed and verified by an independent research company.

The full 2017 ALARM survey is available to download by visiting the website of the Asphalt Industry Alliance.

For more information on companies in this article

Related Content

  • Great opportunities in Asia, conference goers are told
    January 23, 2014
    Asia’s emerging economies will be building roads for the next two decades, delegates at a recent Argus Asian Bitumen conference in Singapore heard. That means there are big opportunities for suppliers of bitumen, related technology and risk management companies - Kristina Smith reports One of the strongest messages to emerge from the Argus Asian Bitumen conference held in Singapore earlier this year is the sheer volume of road building planned in the region. For many countries there are political and finan
  • Minimising the problems of construction disputes
    September 30, 2013
    *Nigel Grout discusses methods for minimising the risk of potential legal issues in construction projects Disputes and the construction industry are synonymous with each other. In a climate of economic downturn, the prevalence of major disputes will continue to be high as parties are unwilling or not able to compromise to reach a settlement. According to the latest ‘Global Construction Disputes’ report by EC Harris, the global average value of a construction dispute in 2012 was nearly US$32 million.
  • Peri UK celebrates 25 years at Rugby HQ
    October 23, 2023

    Formwork and scaffolding specialist Peri opened its depot in Rugby, northern England, in 1998 – 25 years ago. It immediately became home to a large inventory of the company’s products available for sale or hire to customers seeking safe, innovative and optimal temporary works systems for their construction projects.

  • Asset management can be optimised with new technology
    August 22, 2013
    An array of asset management technologies and capabilities are now available to help clients optimise infrastructure assessments. Global survey and geotechnical group, Fugro, has signed a multi-year agreement with Dutch pavement consultant, KOAC•NPC. This move will see the firms combine capabilities to undertake highway surface condition contracts in the Netherlands. Under the agreement, Fugro will collect surface condition data using its ARAN road scanning vehicle. KOAC•NPC, will carry out the post pro