Skip to main content

ALARMing UK road statistics, from the Asphalt Industry Alliance

Within years, one in six of UK local roads will need repairs or face closure, according to the latest Annual Local Authority Road Maintenance – ALARM - survey. The cumulative effect of an ageing network, decades of underfunding, increased traffic and wetter winters has led to around 17% of all local roads reportedly in poor structural condition, with less than five years of life remaining. The 22nd annual ALARM survey is a comprehensive study into local road maintenance funding and conditions. Loca
March 27, 2017 Read time: 2 mins
Within years, one in six of UK local roads will need repairs or face closure, according to the latest Annual Local Authority Road Maintenance – ALARM - survey.

The cumulative effect of an ageing network, decades of underfunding, increased traffic and wetter winters has led to around 17% of all local roads reportedly in poor structural condition, with less than five years of life remaining.

The 22nd annual ALARM survey is a comprehensive study into local road maintenance funding and conditions.

Local authorities need at least nearly €14 billion to bring the network up to scratch – a figure that has remained largely unchanged for four years, according to the report. The gap between the amount local authorities received this year and the amount they say they need to keep their roads in reasonable order is almost €845 million.

Alan Mackenzie, chairman of the AIA, said that local authority highway teams lack the resources to arrest the decline in local road conditions. “Despite this, efficiencies they have achieved in recent years through adopting an asset management approach should be applauded.

“Working smarter, greater collaboration and improved communication are all contributing to their ability to do more with less, though of course there will come a point when there are no further efficiency savings to be found,” he said.

The report found that a large number of local authorities have also been hit with unforeseen costs - England: 43%; London: 53%; Wales: 56%. The primary reason is structural failures caused by adverse weather and increased traffic.

The number of potholes filled over the past year has dropped again for the second successive year, but is still high at 1.7 million – one repaired every 19 seconds.

The 2017 edition was completed by 63% of authorities responsible for roads in England and Wales and was carried out during January and February. The survey is commissioned by the 1360 Asphalt Industry Alliance (AIA) which represents companies producing raw materials used in asphalt for roads and is collated, analysed and verified by an independent research company.

The full 2017 ALARM survey is available to download by visiting the website of the Asphalt Industry Alliance.

For more information on companies in this article

Related Content

  • Microsurfacing a cost-effective road rehabilitation solution
    July 13, 2012
    German company WEIRO has helped to introduce new microsurfacing technology to Estonia to upgrade its roads Estonia's rapidly growing road network requires modern and cost effective road surface rehabilitation technologies. As a result of technological and economical evaluations of the Estonian road network, it has been stated that repairs and upgrading of the existing network will remain the first priority, especially the repair of ruts, which represent a major problem in Estonia. The aim of a trial run of
  • River level monitoring to reduce scour risk
    July 11, 2022
    An OTT ecoLog 1000 water level logger with cellular data connection to Hydromet Cloud was trialled upon the Vales Burn Bridge in Scotland
  • Recycled aggregates report released
    January 24, 2019
    A new report highlights the importance of recycled aggregates for the global construction market. The report has been compiled by research specialist Fact.Mr and shows that prospects remain bullish for the recycled construction aggregates market. According to the report, there were sales of recycled aggregates in excess of over 3.7 million tonnes estimated in 2018, with a 5% growth expected for 2019. The report highlights that the recycled construction aggregates market is influenced by various factors, ra
  • Ukraine opts for Kistler Lineas WiM sensors
    June 18, 2021
    Lineas quartz WIM sensors from Swiss manufacturer Kistler are helping Ukraine’s Ukravtodor to tackle overloaded trucks in an effort to maintain good pavement conditions nationally.