Skip to main content

Warm mix/cold climates

MeadWestvaco (MWV) says that its Evotherm warm mix asphalt technology is now approved by the Colorado Department of Transportation (Colorado DOT) for use in statewide paving projects. The warm mix asphalt system can be used in any traditional hot-mix asphalt application, but with significantly lower temperatures required for paving application. This feature is particularly useful in Colorado's high altitude paving projects and has been tested extensively.
February 28, 2012 Read time: 2 mins
3325 MeadWestvaco (MWV) says that its Evotherm warm mix asphalt technology is now approved by the Colorado Department of Transportation (1490 Colorado DOT) for use in statewide paving projects. The warm mix asphalt system can be used in any traditional hot-mix asphalt application, but with significantly lower temperatures required for paving application. This feature is particularly useful in Colorado's high altitude paving projects and has been tested extensively.

In August 2007, CDOT and MWV began paving a portion of I-70 as an Evotherm test section near the Eisenhower and Johnson Tunnels. This paving project incurred some of the harshest environments to date where Evotherm had been applied - including 89mm of precipitation annually, much of which is frozen and equating to 508mm of snowfall. With 150-200 freeze thaw cycles annually, challenges from annual daily traffic equalling 30,000 vehicles/year on average and 10% truck traffic, this test area provided significant challenges.

CDOT said that the trial with MWV allowed it to answer lingering concerns regarding moisture susceptibility for warm mix asphalt. Even at an altitude of nearly 3,350m, the roadway paved with Evotherm is performing well. The CDOT and the National Center for Asphalt Testing (NCAT) recently published a three year project report, and Evotherm is said to have matched the performance of traditional hot mix asphalt.

For more information on companies in this article

Related Content

  • Shell Bitumen’s new technology cuts air-polluting emissions by 40%
    May 15, 2019
    Shell Bitumen has developed molecular technology that cuts 40% of air-polluting emissions -Kristina Smith reports Shell Bitumen is launching a new technology which drastically reduces the amount of harmful air pollutants produced when asphalt mixes are manufactured and laid on the roads. Called Shell Bitumen FreshAir, it reduces six of the seven pollutants produced by at least 40%. The seventh, ozone, is produced in too small an amount to measure changes. “The World Health Organisation has said that 90%
  • Tunnels and bridges, improving Argentina's major road link
    April 24, 2012
    A road improvement plus tunnel and bridge building contract in an area once inhabited by dinosaurs in northern Argentina, is a small but key part of an ambitious project to complete a road that will eventually link the Atlantic and Pacific coasts of Latin America - Adriana Potts reports. Remote, rough and spectacular are words that come to mind when describing the mountains of Ischigualasto in Argentina's northern province of San Juan This is the only place in the world where an undisturbed sequence of rock
  • Tunnels and bridges, improving Argentina's major road link
    May 2, 2012
    A road improvement plus tunnel and bridge building contract in an area once inhabited by dinosaurs in northern Argentina, is a small but key part of an ambitious project to complete a road that will eventually link the Atlantic and Pacific coasts of Latin America - Adriana Potts reports. Remote, rough and spectacular are words that come to mind when describing the mountains of Ischigualasto in Argentina's northern province of San Juan This is the only place in the world where an undisturbed sequence of rock
  • Atlanta airport’s new apron
    October 12, 2012
    The new Maynard H Jackson Jr International Terminal at Hartsfield- Jackson Atlanta International Airport is now open for business. The 111,484m2 terminal features 12 gates, eight security checkpoints, separate levels for arrivals and departures, as well as a 148,831m2 concrete apron for aircraft to park on arrival. Archer Western won the contract to slipform the concrete apron, replace the existing Taxiway D, as well as other utilities and embankment work. The firm brought in one of its GOMACO paving trains