Skip to main content

VÖGELE and Hamm race to the finish line at Gardermoen Raceway

A professional drag race takes only a few seconds. But in these brief moments, everything – including the track surface – must be absolutely perfect. Apart from having excellent grip, the track must also be completely even. So, when Stange Asfalt was rehabilitating the Gardermoen Raceway near Oslo - Norway’s only permanent dragstrip – the company used state-of-the-art equipment supplied by VÖGELE and Hamm. On the dragstrip, the drivers accelerate up to top speeds of more than 500kph within seconds. After
March 28, 2017 Read time: 2 mins
Maximum precision was called for when paving Gardermoen Raceway near Oslo
A professional drag race takes only a few seconds. But in these brief moments, everything – including the track surface – must be absolutely perfect.

Apart from having excellent grip, the track must also be completely even. So, when Stange Asfalt was rehabilitating the Gardermoen Raceway near Oslo - Norway’s only permanent dragstrip – the company used state-of-the-art equipment supplied by VÖGELE and 228 Hamm.

On the dragstrip, the drivers accelerate up to top speeds of more than 500kph within seconds. After a quarter of a mile – around 400m - the race is already over and the braking parachute is deployed. For this reason the track itself must meet stringent evenness requirements. The tolerance range on the Gardermoen Raceway was only ± 2mm across a width of 4.5m and a crown with a slope of exactly +1° was specified.

To achieve this, Stange Asfalt opted to use a SUPER 1900-3i working with two VÖGELE multi-cell sonic sensors for grade and slope control. To guarantee continuous paving without interruption, a VÖGELE PowerFeeder type MT 3000-2i Ofiset was used for material feed.

Next, Hamm DV 70 VO and DV 90 VO rollers - each equipped with vibratory and oscillating drums - compacted all three layers of the new asphalt pavement. The quality of the machines and the experience of the Stange Asfalt team in meeting exacting quality levels meant everyone was a winner at Gardermoen Raceway.

For more information on companies in this article

Related Content

  • New asphalt paving machines are coming to market
    April 7, 2017
    Several of the key asphalt paver manufacturers are rolling out new models that deliver increased performance and capabilities - Mike Woof writes The pace of development in the asphalt paving equipment sector is high, with a wide array of new machines coming to market. All of the major manufacturers are introducing new models for 2017, while there are also key business developments that are ongoing. One of the most notable business moves in the road machinery sector is the agreement between the Fayat G
  • Hamm’s innovative twin drum asphalt roller
    April 10, 2024
    The HD+ 120i V-VIO 12 t tandem roller has the latest Hamm cab, offering good all round visibility as well as various interfaces to connect telematics systems.
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • BOMAG Advanced Pave, the digital co-pilot
    May 1, 2021
    BOMAG introduces its new generation of Universal and Highway class pavers