Skip to main content

VÖGELE and Hamm race to the finish line at Gardermoen Raceway

A professional drag race takes only a few seconds. But in these brief moments, everything – including the track surface – must be absolutely perfect. Apart from having excellent grip, the track must also be completely even. So, when Stange Asfalt was rehabilitating the Gardermoen Raceway near Oslo - Norway’s only permanent dragstrip – the company used state-of-the-art equipment supplied by VÖGELE and Hamm. On the dragstrip, the drivers accelerate up to top speeds of more than 500kph within seconds. After
March 28, 2017 Read time: 2 mins
Maximum precision was called for when paving Gardermoen Raceway near Oslo
A professional drag race takes only a few seconds. But in these brief moments, everything – including the track surface – must be absolutely perfect.

Apart from having excellent grip, the track must also be completely even. So, when Stange Asfalt was rehabilitating the Gardermoen Raceway near Oslo - Norway’s only permanent dragstrip – the company used state-of-the-art equipment supplied by VÖGELE and 228 Hamm.

On the dragstrip, the drivers accelerate up to top speeds of more than 500kph within seconds. After a quarter of a mile – around 400m - the race is already over and the braking parachute is deployed. For this reason the track itself must meet stringent evenness requirements. The tolerance range on the Gardermoen Raceway was only ± 2mm across a width of 4.5m and a crown with a slope of exactly +1° was specified.

To achieve this, Stange Asfalt opted to use a SUPER 1900-3i working with two VÖGELE multi-cell sonic sensors for grade and slope control. To guarantee continuous paving without interruption, a VÖGELE PowerFeeder type MT 3000-2i Ofiset was used for material feed.

Next, Hamm DV 70 VO and DV 90 VO rollers - each equipped with vibratory and oscillating drums - compacted all three layers of the new asphalt pavement. The quality of the machines and the experience of the Stange Asfalt team in meeting exacting quality levels meant everyone was a winner at Gardermoen Raceway.

For more information on companies in this article

Related Content

  • Multiple milling machines removing surface
    April 24, 2019
    Milling subcontractor Pavement Recycling Systems removed thousands of tonnes of reclaimed asphalt pavement (RAP) from a runway at Oakland International Airport in California recently. The firm used a fleet of six Wirtgen W 210i cold milling machines to remove the asphalt in less than 60 hours from Runway 12-30, along the shore of San Francisco Bay. In total, 47,000tons of asphalt were milled within a 60-hour time frame, nonstop day and night, plus a single-shift second phase a week later. The firm start
  • Rubber tyred rollers see key developments
    June 23, 2015
    A series of new rubber tyred asphalt compactors are now coming to market from several key manufacturers - Mike Woof writes Several of the major European compactor manufacturers are introducing new rubber tyred machines to meet demand. Pneumatic tyred rollers are often used for finishing work in road construction, due to the high quality surface they can deliver.
  • Asphalt paving developments
    March 13, 2012
    US and European asphalt paving needs are different, but some firms are bridging that gap, reports Mike Woof. With a clear differentiation between the US and European asphalt paving markets, manufacturers from the latter are now developing machines aimed at the former. The US and European markets for paving machines have developed along very different lines. North American pavers are designed for high throughputs and high paving rates, having been designed to meet a need to build roads over long distances wi
  • Wirtgen milling machines and soil stabilisers land in Sardina
    July 26, 2016
    Wirtgen cold milling machines recently demonstrated their ability on runway rehabilitation work at Alghero-Fertilia Airport in Sardinia. Alghero-Fertilia Airport, about 8km northwest of Alghero, is one of three commercial airports on the Italian island. Built as a military airport in the late 1930s, Alghero-Fertilia still occasionally serves this purpose today. It is also a major hub for low-cost carriers that ferry many of the annual 1.7 million passengers who pass through the airport. Summer tourist mo